|
COMMERCE BUSINESS DAILY ISSUE OF JULY 15,1997 PSA#1887Department of The Army, Directorate of Contracting, Building 622, Fort
Stewart, Georgia 31314-5189 Z -- CONSTRUCT CLIMATE CONTROLLED WAREHOUSE SOL DAKF10-97-B-0047 DUE
082597 POC Mae Riggens (912) 767-1868, Hope D. Flythe, Contract
Specialist (912) 767-2699 WEB: DOC Homepage,
http://www.stewart.army.mil/doc/intro.html. The Army requires a firm
fixed price contract to Construct Climate Controlled Warehouse,
Building 7906, Hunter Army Airfield, Georgia. The work includes, but is
not limited to: Demolish existing 15" thick concrete apron. Construct
a single story pre engineered metal building. Roof pitch of rigid frame
is 1 in 12. Foundation is a 6" thick reinforced concrete slab on grade
with a contnuous footing. Exterior skin is metal roofing and siding.
Interior walls are CMU or gypsum board on metal studs. Plumbing will be
a complete system with fixtures, piping and accessories. Mechanical
systems will consist of two split system heat pumps complete with
individual system controls. Exhaust fans and accessories are part of
the mechanical systems to be provided. Electrical systems will consist
of complete lighting, power and exterior electrical system. A fire
alarm system shall be provided with a transmitter for central station
reporting. A fire sprinkler system will be provided. Complete design
and layout of the system is required. (0192) Loren Data Corp. http://www.ld.com (SYN# 0181 19970715\Z-0030.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|