|
COMMERCE BUSINESS DAILY ISSUE OF JULY 18,1997 PSA#1890Sequoia & Kings Canyon National Parks, ATTN: John Bauer, Three Rivers,
CA 93271 Z -- CONSTRUCT WATER SYSTEM IN THE WOLK CREEK AREA, PRARIE CREEK STATE
PARK, REDWOOD NATIONAL & STATE PARKS, HUMBOLDT COUNTY, CA SOL
1443IB8550-97-007 DUE 082997 POC Technical -- Bill Vines, 707-464-6105;
Contracting Officer -- John P. Bauer, 209-565-3180 E-MAIL: Contracting
Office, Sequoia National Park by e-mail, patrick_bauer@nps.gov.
Provide all labor, materials, equipment, and supervision necessary for
the construction of a pump house with fire pump and propane engine
with associated pressure tanks, piping, valving, controls, chlorination
equipment, and miscellaneous electrical work. The project also includes
two 16,000 gal glass- fused-to-steel water tanks, approximately 1,000
lineal feet of 4-inch PVC water line, approximately 1,630 lineal feet
of 6-inch PVC water line, 5 hydrants, 200 lineal feet of conduit with
conductors, and propane tank. Remove existing pump and accessories and
destroy existing well. Estimated price range of this project is
between $250,000 and $500,000. A limited number of solicitation
packages is available on a first-come, first-served basis until the
supply is exhausted. There will be no charge for the solicitation
package, however only one copy will be furnished to each requesting
party. Interested parties should request a copy in writing from the
Contracting Office at Sequoia National Park, or by fax at 209-565-3700.
Telephone requests will not be honored. (0196) Loren Data Corp. http://www.ld.com (SYN# 0194 19970718\Z-0017.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|