|
COMMERCE BUSINESS DAILY ISSUE OF JULY 23,1997 PSA#1893Officer In Charge Of Construction, Gulfport Area Office, 100 Annex Rd.,
Suite 101, Biloxi, MS 39531-3111 Z -- EXTERIOR PAINTING OF ELEVATED WATER TANK 180, NAVAL CONSTRUCTION
BATTALION CENTER, GULFPORT, MS SOL N62467-97-B-5721 DUE 090297 POC
Contact Liz Story 601/377/8576/ D. W. Hawkins, Contracting Officer,
601/377-8581 The work includes preparation, cleaning, and painting of
the exterior of Water Tank #180 which consists primarily of an elevated
steel potable water storage tank, steel support structure, and
associated piping. Approximate overall height of the water tank is 140
feet. Abrasive vacuum "brush off" blasting will be required on
approximately 14,450 sq.ft. of tank surface and near white abrasive
vacuum blasting will be required on the remaining 3,000 sq. ft. of
rusted or deteriorated tank surface. Existing paint on Water Tank 180
contains lead. That portion of paint which is to be removed shall be
removed, handled, and disposed of as hazardous waste. Estimated cost
range $25,000.00 to $100,000.00. Time for completion one hundred fifty
(150) calendar days. (0199) Loren Data Corp. http://www.ld.com (SYN# 0187 19970723\Z-0013.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|