|
COMMERCE BUSINESS DAILY ISSUE OF JULY 24,1997 PSA#1894USDA -- FOREST SERVICE, SAN BERNARDINO NATIONAL FOREST, 1824 SOUTH
COMMERCENTER CIRCLE, SAN BERNARDINO, CA 92408-3430 Y -- ALPINE PEDAL PATH SOL R5-27-97-5032 DUE 090397 POC Jennie
Camacho, (909) 884-6634 Ext. 3092. Douglas Hyde-Sato, Contracting
Officer. The project consists of the new construction of 0.73 miles of
8 wide, paved bike trail. Principal items of construction include
quality control and quantity measurement, establish and maintain
vertical grade control of the existing marked centerline alignment,
0.73 miles of clearing and grubbing, excavation placement, 350 CY of
borrow excavation, placement of 445 tons of hot bituminous pavement,
installation of 80 LF of small diameter C.M.P.A., placement of 45 CY of
hand placed riprap, placement of 170 LF of asphalt curbing,
construction of 57 SY of rock lined drainage ditch, construction of
2-10' wide wooden foot bridges (1-20' span and 1-34' span),
installation of 1-4' wide x 10' long steel grated Y-ditch crossing,
installation of 10-6' rest area wood benches and 1-wood picnic table.
Additional items include the installation or regulatory signs and bike
racks. Estimated cost range of this project is
$100,000.00-$250,000.00. Project is located in San Bernardino County,
California. SIC 1611. Scheduled issue date for this Solicitation is
08/04/97. To respond to this notice send a $25.00 check or money order
made payable to USDA -- Forest Service for each solicitation package
along with your name, address telephone number, fax number, and the
solicitation number. A package will not be sent until a check or money
order is received. Do not send cash. (0203) Loren Data Corp. http://www.ld.com (SYN# 0165 19970724\Y-0026.SOL)
Y - Construction of Structures and Facilities Index Page
|
|