|
COMMERCE BUSINESS DAILY ISSUE OF JULY 25,1997 PSA#1895U. S. ARMY ENGINEER DISTRICT, MOBILE, ATTN: CESAM-CT (PLANS ROOM NO.
1000A), P. O. BOX 2288 MOBILE ALABAMA 36628-0001, OR 109 ST. JOSEPH
STREET MOBILE AL 36602 Y -- REPLACE ROOF & HVAC, U.S. ARMY RESERVE CENTER ORLANDO, FL SOL
DACA01-97-B-0098 DUE 090997 POC Contact Karen Johnson, (334) 690-2535;
Contracting Officer, Gene L. Curtis (Site Code W31XNJ) The work
consists of removing the packaged rooftop heat pump and replacing it
with a new unit of the scheduled capacity. The new unit will be
connected to the existing ductwork. The existing air distribution will
be rebalanced along with new dampers and a new thermostat will be
provided. Additionally the existing single-ply roof will be removed and
replaced with a modified bitumen roof. Bidders, subcontractors and
Dodge/Plan Rooms are encouraged to register on the Internet to receive
one CD-ROM. Registration on the Internet should minimize possible
errors and delay in receiving the CD-ROM. Registration instructions are
available on the Internet at http..//www.sam.usace.army.mil/sam/ct.
Registration may also be completed by faxing to 334-694-4343, Attn:
PlansRoom, CESAM. Telephonic requests will not be accepted. In either
case, those registering are responsible for the accuracy of the
information on the mailing list. Registration must include the firms
physical address, telephone, fax number and a pointof contact.
Registration should be completed one week prior to the issue date. All
notifications of changes to this solicitation shall be made through
the Internet only. It is therefore the contractors responsibility to
check the Internet address listed above daily, for any posted changes
to this solicitation. Actual solicitation amendments will be issued
either by fax, 3.5" diskette or CD-ROM. The plans and specifications
will be issued on Compact Disc (CD-ROM) only and will be provided free
for charge. Plans and specifications will not be provided in a printed
paper format; however, the Government reserves the right to revert to
paper medium when it is determined to be in the Government's best
interest. All bid forms, bid bonds, and other normal documents required
for the bid submittal, including amendments to the bid submittal, shall
be in paper medium. Electronic medium for the bid submittal documents
will not be allowed. Critical path method (Network Analysis System) is
required. For this job, a small business is defined as having average
annual receipts of less than $17,000,000 for the past three years.
Specific questions related to this project may be answered by Carol
Conklin at 334-694-3605 fax 334-690-2902. Refer questions on
distribution of plans/specifications to PlansRoom at 334-690-2535. Bid
documents are available on or about 7 August 1997. Estimated cost of
work is between $25,000 and $100,000. Requests for plans and
specifications shall indicate in writing whether firm will bid as a
prime contractor or a subcontractor. All responsible sources may submit
a (0204) Loren Data Corp. http://www.ld.com (SYN# 0182 19970725\Y-0018.SOL)
Y - Construction of Structures and Facilities Index Page
|
|