|
COMMERCE BUSINESS DAILY ISSUE OF JULY 30,1997 PSA#1898U. S. ARMY CORPS OF ENGINEERS, 2000 FT. POINT RD, CONTRACTING DIVISION,
P. O. BOX 1229, GALVESTON TX 77553-1229 Z -- REPLACE MOORING FACILITIES, BRAZOS RIVER FLOOD GATES AND COLORADO
RIVER LOCKS, GULF INTRACOASTAL WATERWAY, TEXAS IN BRAZORIA AND
MATAGORDA COUNTIES, TEXAS SOL DACW64-97-B-0027 DUE 091697 POC Contract
Specialist Lucy Smith (409) 766-3845 Contracting Officer Mary A.
Monnell (409) 766-3851 (Site Code DACW64) The work consists of removal
and replacement of 24 existing structures with mooring buoys at Brazos
River Floodgates and removal and replacement of 10 existing structures
with mooring buoys on the East side, North bank at Colorado River
Locks. The cost for one set of plans and specifications: Full Size
$25.00; Half Size $17.50 (Non-Refundable). Subcontracting goals for the
Galveston District are: 55% Small Business; 8.5% Small Disadvantaged
Business; and 3% Woman-Owned Small Business. Price range for this work
is between $1,000,000.00 and $5,000,000.00 (0209) Loren Data Corp. http://www.ld.com (SYN# 0209 19970730\Z-0048.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|