COMMERCE BUSINESS DAILY ISSUE OF JULY 31,1997 PSA#1899USPFO for Utah, P.O. Box 2000, 12953 Minuteman Drive, Draper, UT
84020-2000 C -- DESIGN COMPOSITE AIRCRAFT MAINTENANCE COMPLEX SOL
DAHA42-97-R-0010 POC POC: Sherri Shepherd, Contract Specialist,
801-576-3884 The Government requires a contract for the design of a
Composite Aircraft Maintenance Complex to be constructed at the Utah
Air National Guard Base, Salt Lake City, Utah. The scope of services
includes preparation of alternative design approaches, design documents
(specifications and drawings), cost estimates, economic studies and
reports, construction inspection, material submittal reviews, and
change order processing for the design and construction of this
facility. Project scope covers the design of a new Composite Aircraft
Maintenance Facility with shops, maintenance bays, offices, training
and storage areas. Also included will be the remodel of the General
Purpose Shop, Fuel Cell Hangar and Maintenance Hangar. All work to
include associated electrical and mechanical systems, utilities and
landscape. The new Composite Aircraft Maintenance Facility will consist
of approximately 38,000 square feet. Technical capabilities required
but not limited to structural, architectural, mechanical, and
electrical disciplines. Evaluation factors in order of importance are:
(1) Professional qualifications necessary for satisfactory performance
of required services; (2) Specialized experience and technical
competence in the type of work required (evaluation factors (1) and (2)
will be given the same amount of importance in the evaluation); (3)
Capacity to accomplish the work in the required time; (4) Past
performance on contracts with government agencies and private industry
in terms of cost control, quality of work and compliance with
performance schedules; (5) Location in the general geographical area of
the project and knowledge of the locality of the project; (6)
Demonstrated success in prescribing the use of recovered materials and
achieving waste reduction and energy efficiency in facility design.
Four firms will be selected by a pre-selection board. These firms will
be interviewed in person by the final selection board and will be
evaluated on the above criteria. Construction cost range is between
$5,000,000 and$10,000,000. This will be a firm fixed price contract
with options for each phase. This is not a Request for Proposal.
Responsible firms of all sizes are invited to submit Standard Form 254
and Standard Form 255 to the Contracting Office by 4:00 P.M. MDT 30
days after publication of this announcement. (0210) Loren Data Corp. http://www.ld.com (SYN# 0027 19970731\C-0007.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|