COMMERCE BUSINESS DAILY ISSUE OF AUGUST 1,1997 PSA#1900USPFO for NORTH CAROLINA, ATTN: Contracting Officer, 4201 Reedy Creek
Road, Raleigh, NC 27607-6412 Y -- CONSTRUCT COMPOSITE MAINTENANCE FACILITY SOL DAHA31-97-B-0003 DUE
090997 POC Contract Specialist EDITH S. DOZIER (919) 664-6040 Ralph L.
Young, MSG (919) 664-6019 Norman L. Bryant, SGT (919) 664-6022 (Site
Code W36HUG) Composite Maintenance Facility for the North Carolina Air
National, (NCANG), New London, North Carolina. The project consists of
six new structures (approximately 35,000 sq ft) and all associated site
preparations and utilities to include grading, borrowed fill and rock
removal as required. Two warehouses (RSP and WRM) shall be
preengineered metal building systems, metal roof, metal siding and low
masonry combination walls. One facility (parking shed) shall be
preengineered metal building system, metal roof, metal siding on a
concrete slab. The hazardous Storage Facility shall be a free standing
preengineered building to include electrical, tele-communication and
fire protection systems. The Dining Facility shall be cmu load bearing
walls, steel joist and metal deck roof structure and a mansard roof
around the perimeter of the facility with a single ply roof will
provided in the interior of the roof. A truck and dumpster dock is
provided north of the facility. The Vehicle Maintenance building shall
be cmu load bearing walls, steel joist and metal deck roof structure
and a standing seam metal roof system to include a new paint booth,
make up, filter and exhaust systems, breathing air piping and
compressor system as well as all delivery systems for oil/lube, and
carbon monoxide exhaust systems, all vehicle lifts and overhead cranes.
The center of the facility will include an administration area. Site
utilities are to be extended from existing facilities, to include
coordination between the local utilities and connections to all of the
proposed buildings. Soils Erosion control systems, Landscape and
security fencing will be provided as required. ABI #1: Provide grading,
stone base, asphalt paving and curb and gutter adjacent to the existing
Base Civil Engineer's warehouse to include electrical service, lighting
and communication systems to the existing facility. ABI #2: Provide
clear water repellant sealer on all exterior masonry systems and
provide a minimum 5-year warranty on this system. ABI #3: Provide
landscape in the proposed project area, exclusive of grassing and
selected landscape adjacent to the new dining facility. Furnish all
materials and equipment necessary to perform work as outlined in
project specifications and drawings. Submission of a bid by a
contractor shall be accepted as prima facia evidence that he has
examined the job and specifications and he has satisfied himself as to
the nature and location of the work and all other matters which can in
any way affect the work or cost thereof under this contract. Any
failure of the contractor to acquaint himself with all available
information including a physical survey of the proposed work will not
relieve him from successfully performing the work required to be done
for a complete, finished job. The above outline of principle features
of the work in no way limits the responsibility of the contractor to
perform all work and furnish all tools and labor required by the
specifications referred to herein. The completion time for this project
is 360 calendar days. Official written request for information must be
in writing and refer to IFB, DAHA31-97-B-0003, Composite Maintenance
Facility, WEFM969570. This procurement is offered on an unrestricted
basis. The Standard Industrial Code (SIC) is 1542. Bid opening is
tentatively scheduled for 9 September 1997. Invitation for Bids (IFB)
will be issued to potential prime contractors (excluding
subcontractors, consultants and material suppliers) on a first received
first served basis until supply is exhausted. Telephone requests will
not be honored. Plans may be reviewed at AGC or F.W. Dodge offices in
Raleigh, Charlotte, and Greensboro, NC. A non-refundable charge in the
amount of $200.00, in the form of a certified bank check, cashier's
check or money order made payable to "DAO, DFAS-LI" is required for
each set of bidding material requested. The successful contractor will
perform a minimum of 12% of the contract with its own employees not
including the cost of materials, reference FAR Clause 52.236-1,
"Performanceof Work by the Contractor". In accordance with FAR 36.204,
magnitude of cost: between $1,000.000 and $5,000,000**** (0211) Loren Data Corp. http://www.ld.com (SYN# 0136 19970801\Y-0022.SOL)