COMMERCE BUSINESS DAILY ISSUE OF AUGUST 5,1997 PSA#1902U.S. ARMY ENGINEER DISTRICT, MOBILE, ATTN: CESAM-EN-MN, P.O. BOX 2288,
MOBILE ALABAMA 36628-0001 OR 109 ST., JOSEPH STREET MOBILE AL 36602 T -- IDC F/SURVEYING, HYDROGRAPHIC & MAPPING SVCS TO SUPPORT THE
MOBILE DISTRICTS CIVIL WORKS PRGM, OPERATIONS DIV, TUSCALOOSA SITE OFC;
RFP: DACW01-97-R-0065 SOL AECXXX-7150-0012 POC Contact Jack Pruett,
(205) 441-5755, Contracting Officer, Sue L. Speights (Site Code W31XNJ)
CONTRACT INFORMATION: A-E services are required for an Indefinite
Delivery Contract for Hydrographic, Surveying, and Mapping Services to
Support the Mobile Districts Civil Works Program, Operations Division,
Tuscaloosa Site Office. This announcement is open to all businesses
regardless of size. The contract will be awarded for a one year period
with an option to extend the contract for two additional periods. Work
to be subject to satisfactory negotiation of individual task orders
with the total contract not to exceed $250,000 for each contract
period. (If the $250,000 limit for a contract period is exhausted or
nearly exhausted prior to 12 months after the start of the period, the
option for the next contract period may be exercised). Selection of AE
firms is not based upon competitive bidding procedures, but rather upon
the professional qualifications necessary for the performance of the
required services. If a large business is selected for this contract,
it must comply with FAR 52.219-9 regarding the requirement for a
subcontracting plan for that part of the work it intends to
subcontract. The subcontracting goals for this contract are a minimum
of 52.5% of the contractor's intended subcontract amount be placed with
small businesses (SB), including small disadvantaged businesses (SDB),
and women-owned business, 8.8% be placed with SDB, and 5% for
women-owned business. The subcontracting plan is not required with this
submittal. The wages and benefits of service employees (see FAR 22.10)
performing under these contracts must be at least equal to those
determined by the Department of Labor under the Service Contract Act.
PROJECT INFORMATION: The contract will primarily be used to: (A)
perform hydrographic surveys of rivers within the Tuscaloosa Site
Office boundaries (all soundings will be compensated via Heave
Compensation Devices as per the U.S. Army, Corps of Engineers
Hydrographic Survey Manual EM 110-Z-1003 dated 28 February 1991); (B)
perform Topographic surveys within the Tuscaloosa Area Office project
area; (C) perform Global Positioning System Surveys for high order
control; (D) perform traverse and triangulation of second or third
order accuracy, levels for vertical control of second or third order
accuracy, route locations, roads, levees, dikes, quantity surveys for
preconstruction and/or final cross-sections, and computations of
quantities using TIN (Triangulated Irregular Network). The work will be
in Alabama, and Mississippi or other locations within the Mobile
District civil boundaries when such work is assigned to the Tuscaloosa
Site Office. SELECTION CRITERIA: See Note 24 for general selection
process. The selection criteria are listed below in descending order of
importance (first by major criterion and then by each sub-criterion).
Criteria A-E are primary. Criteria F-G are secondary and will only be
used as "tie-breakers" among technically equal firms. A. Professional
Qualifications: The selected firm must have, either in-house or through
consultants, the following: (1) Registered Land Surveyor or Certified
Hydrographic Surveyor in Alabama and Mississippi; (2) Project Manager;
(3) Hydrographic Party Chief; (4) Hydrographic Instrument Person; (5)
Land Party Chief; (6) Land Instrument Person; (7) Draftsperson; (8)
CADD Operator. Resumes (Block 7 of the SF 255) must be provided for
these disciplines, including consultants. Use the nomenclature as shown
in this announcement. Additional evaluation factors are provided in
order of importance: B. Specialized experience and technical competence
in: (1) hydrographic surveys using steel tagline, electronic distance
measuring equipment (Range/Range or Range/Azimuth) and electronic depth
measuring equipment; (2) Differential Global Positioning System (DGPS)
real time positioning; (3) topographic surveys using a Total Station
with data collector; (4) control surveys using Global Positioning
System; (5) provide the data in digital format compatible to AutoCad
Release12; (6) Quality Management Plan: Describe in Block 10 of the SF
255 the firms's quality management plan, including the team's
organizational chart, quality assurance, cost control, and coordination
of the inhouse work with consultants. C. Capacity to Accomplish the
Work: The ability, equipment, and expertise to field up to six (6)
hydrographic survey parties during the Spring with a sustained effort
of four (4) hydrographic parties; D. Past Performance: Past performance
on DoD and other contracts with respect to cost control, quality of
work, and compliance with performance schedules; E. Geographic
Location: Geographic location with respect to Southeastern U.S. F.
Small Business and Small Disadvantage Business Participation: Extent of
participation of small businesses, small disadvantaged businesses,
historically black colleges and universities, and minority institutions
in the proposed contract team, measured as a percentage of the total
estimated effort; G. Equitable Distribution of DoD contracts: Volume of
DoD contract awards in the last 12 months as described in Note 24.
SUBMISSION REQUIREMENTS:See Note 24 for general submissions
requirements. Firms must submit a copy of their SF 254 and SF 255, and
a copy of each consultant's SF 254. The 11/92 edition of the forms
must be used, and may be obtained from the Government Printing Office.
These must be received in the Mobile District Office (CESAM-EN-MN) not
later than close of business on the 30th day after the date of
publication of this solicitation in the Commerce Business Daily. Along
with the SF 255 and SF 254, a Summary of Capability Worksheet, version
94.1 or higher, must be requested and submitted with the proposal. All
previous Summary of Capability Worksheet are obsolete. A worksheet in
ASCII format (must send a 3 1/2 inch unformatted floppy disk) should
be requested by sending a self addressed envelope for a hard copy or a
Floppy Disk Mailer for a digital copy to: Mobile District Corps of
Engineers; ATTN: CESAM-EN-MS; P.O. Box 2288; Mobile, AL 36628-0001. If
the 30th day is a Saturday, Sunday, or Federal holiday, the deadline
is the close of business of the next business day. Include ACASS number
in Block 3b of the SF 255. Call the ACASS Center at 503-326-3459 to
obtain a number. A maximum of ten (10) projects, including the prime
and consultants, will be reviewed in Block 8. Solicitation packages are
not provided. This is not a request for proposal. As required by
acquisition regulations, interviews for the purpose of discussing
prospective contractors' qualifications for the contract will be
conducted only for those firms considered highly qualified (0213) Loren Data Corp. http://www.ld.com (SYN# 0120 19970805\T-0006.SOL)
T - Photographic, Mapping, Printing and Publication Services Index Page
|
|