|
COMMERCE BUSINESS DAILY ISSUE OF AUGUST 5,1997 PSA#1902USDI, National Park Service, Point Reyes National Seashore, Point
Reyes, CA 94956 Y -- CONSTRUCT RANGE FENCING AT POINT REYES NATIONAL SEASHORE, CA SOL
1443-RQ-8530-97-022 DUE 090297 POC Kris Swofford, Contracting Officer,
415/663-8522, ext 230 E-MAIL: to contact the contracting officer via
e-mail, kris_swofford@nps.gov. Project consists of all labor,
equipment, and materials to construct approximately 5,000 linear feet
of barbed wire exclusionary fencing along Blue Line Creek at Point
Reyes National Seashore, Marin County, CA. Work will include the
construction of eight 12 foot barbed wire gates and removal and
disposal of old fencing wherever it interferes with new fence
construction. Fencing shall be 5 wire, 4 ft high, using wooden line
posts at 15 ft spacing and 7-1/2 ft stay spacing. Single H braces will
be installed at ends, both sides of gates, and at 350 ft intervals.
Double H braces will be installed at direction changes and major slope
changes. Rise and dip posts will be installed as needed. Wire shall be
15-1/2 gauge high tensile, 2-pt, class 3, galvanized, with minimum
breaking load of 950 pounds meeting ASTM-A121. All wood shall be CCA
pressure treated. Project completion time is 60 days. The estimated
price range is between $25,000 and $100,000. This acquisition is
unrestricted. Interested parties may obtain a copy of the Request for
Quote by written or facsimile request only. Fax 415/663-8132. (0212) Loren Data Corp. http://www.ld.com (SYN# 0139 19970805\Y-0005.SOL)
Y - Construction of Structures and Facilities Index Page
|
|