COMMERCE BUSINESS DAILY ISSUE OF AUGUST 13,1997 PSA#1908NASA/Goddard Space Flight Center, Code 212, Greenbelt, MD 20771 K -- SOLE-SOURCE TIME EXTENSION AND INCREASE IN SCOPE FOR COMPLETION
OF THE UTILITY CONTROL SYSTEM (UCS) AT GODDARD SPACE FLIGHT CENTER DUE
082597 POC Jennifer O'Connell, Contract Administrator, Phone (301)
286-5254, Fax (301) 286-0247, Email Jennifer.A.OConnell.1@gsfc.nasa.gov
-- Leigh Anne C. Giraldi, Contracting Officer, Phone (301)286-7464, Fax
(301)286-0247, Email Leigh.Anne.C.Giraldi.1@gsfc.nasa.gov WEB: Click
here for the latest information about this notice,
http://procurement.nasa.gov/EPS/GSFC/date.html#RFP5-35079-108. E-MAIL:
Jennifer O'Connell, Jennifer.A.OConnell.1@gsfc.nasa.gov. NASA/GSFC
intends to modify its existing Contract NAS5-35079 with Johnson
Controls, Incorporated to increase the current period of performance
from five years to ten years and to increase the maximum contract value
from $12,000,000 to $20,000,000. The existing $12,000,000 fixed price
indefinite quantity contract accomplished the conversion of the
existing utility control system (UCS) and pneumatic heating,
ventilating and air conditioning (HVAC) controls at GSFC with a single
new integrated system Johnson Controls' Metasys. One single,
integrated system must be installed in all new building construction
and in the modification and/or restoration of any equipment currently
being monitored and/or controlled by the UCS. The increase in the
period of performance and the maximum value of the contract covers all
planned new construction and modification and restoration projects
over the next 5 years. Since Metasys is a proprietary system, the
current Contractor, Johnson Controls, is the only responsible source
able to make modifications to Metasys. Johnson Controls does not
outsource this work to any third party vendors. Further, at present,
there is no single standard communications protocol which will allow
devices of other manufacturers to communicate transparently with the
existing energy management and control system over the communication
network. Compatibility with existing Johnson Controls' Metasys is
mandatory. Utilizing Johnson Controls' equipment for the continued
replacement, modification and/or, restoration of the Energy Management
Control System (EMCS) is essential to achieving the Government's
stated requirements, and therefore, precludes consideration of products
manufactured by other companies. The statutory authority permitting
other than full and open competition is 10 USC 2304 (c) (1) -- ONLY ONE
RESPONSIBLE SOURCE. All responsible sources desiring consideration are
requested to fully identify their interest and capabilities on or
before August 25, 1997, to the Contract Administrator citedbelow. See
Numbered Note 22. (0223) Loren Data Corp. http://www.ld.com (SYN# 0044 19970813\K-0001.SOL)