|
COMMERCE BUSINESS DAILY ISSUE OF AUGUST 14,1997 PSA#1909U.S. Army Engineer District, Chicago, Corps of Engineers, 111 North
Canal Street, Chicago, Illinois 60606-7206 C -- A/E CONTRACT FOR TECHNICAL COMMITTEE FOR REVIEW OF HYDROLOGY AND
FLOW MEASUREMENT FOR CHICAGO DISTRICT, CORPS OF ENGINEERS POC For
technical information contact Dave Kiel at (312)353-6400 X3117 1.
CONTRACT INFORMATION: Needed is a qualified individual to act as
chairperson on a 3 member technical committee to review, evaluate and
make recommendations on the procedures used in measuring and accounting
for the diversion of water from Lake Michigan at Chicago by the State
of Illinois. This announcement is limited to small businesses with an
annual average gross revenue which has not exceeded 2.5 million dollars
over the last three fiscal years. The standard industrial
classification for this requirement is 8711. This contract is subject
to the availability of fiscal year 1998 funds. It is anticipated that
approximately 3 to 4 months worth of involvement over a 9 month period
will be required by the committee members. The contract is scheduled
to be awarded in early 1998. 2. PROJECT INFORMATION: A 1967 US Supreme
Court decree limits the State of Illinois from diverting more than
3,200 cfs from Lake Michigan. A 1980 amendment to this decree called
for the establishment of a 3 member technical committee to review and
report its findings and make recommendations as to whether the present
accounting procedures use the best current engineering practice and
scientific knowledge in computing the diversion. 3. SELECTION CRITERIA:
Selection of the chairperson will be based upon the candidate's
recognized experience and technical expertise in hydrology and flow
measurements. The 3-member technical committee will be composed of a
chairperson, a hydrologic and hydraulic modeling expert, and an expert
in flow measurements. The criteria used in evaluating the chairperson
will consist of: 1) hydrologic and hydraulic experience with the
diverted Lake Michigan watershed and the watersheds of northeastern
Illinois, 2) education and experience in hydrology, hydraulics and
computer modeling, 3) experience in flow measurements, and 4) knowledge
of statistical analyses as applied to hydrology and hydraulics. The
following individuals are not eligible for selection to the committee:
any Corps of Engineers employees or any employees or paid consultants
of the parties of the US Supreme Court proceedings other than the
consultants of the US. 4. SUBMISSION REQUIREMENTS: See Note 24 for
general submission requirements. Interested individuals having the
capabilities to perform this work must submit two copies of SF 255
(11/92 edition), and two copies of SF 254 (11/92 edition) to the above
address not later than the close of business on the 30th day after the
date of announcement. If the 30th day is a Saturday, Sunday, or Federal
holiday, the deadline is the close of business of the next business
day. Include the individual's ACASS number in SF 255, Block 3b. For
ACASS information, call 503-326-3459. A project-specific design quality
control plan must be prepared and approved by the Government as a
condition of contract award, but is not required with the submission.
Solicitation packages are not provided. This is not a request for
proposal. Fees will be negotiated upon selection. (0224) Loren Data Corp. http://www.ld.com (SYN# 0034 19970814\C-0006.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|