Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF AUGUST 14,1997 PSA#1909

U.S. Army Engineer District, Chicago, Corps of Engineers, 111 North Canal Street, Chicago, Illinois 60606-7206

C -- A/E CONTRACT FOR TECHNICAL COMMITTEE FOR REVIEW OF HYDROLOGY AND FLOW MEASUREMENT FOR CHICAGO DISTRICT, CORPS OF ENGINEERS POC For technical information contact Dave Kiel at (312)353-6400 X3117 1. CONTRACT INFORMATION: Needed is a hydrologic and hydraulic modeling expert to participate on a 3 member technical committee to review, evaluate and make recommendations on the procedures used in measuring and accounting for the diversion of water from Lake Michigan at Chicago by the State of Illinois. This announcement is limited to small businesses with an annual average gross revenue which has not exceeded 2.5 million dollars over the last three fiscal years. The standard industrial classification for this requirement is 8711. This contract is subject to the availability of fiscal year 1998 funds. It is anticipated that approximately 3 to 4 months worth of involvement over a 9 month period will be required by the committee members. The contract is scheduled to be awarded in early 1998. 2. PROJECT INFORMATION: A 1967 US Supreme Court decree limits the State of Illinois from diverting more than 3,200 cfs from Lake Michigan. A 1980 amendment to this decree called for the establishment of a 3 member technical committee to review and report its findings and make recommendations as to whether the present accounting procedures use the best current engineering practice and scientific knowledge in computing the diversion. 3. SELECTION CRITERIA: Selection of the modeling expert will be based upon the candidate's recognized experience and technical expertise in hydrology and flow measurements. The 3-member technical committee will be composed of a chairperson, a hydrologic and hydraulic modeling expert, and an expert in flow measurements. The criteria used in evaluating the modeling expert will consist of: 1) education and experience in hydrology, hydraulics and computer modeling, 2) hydrologic and hydraulic experience with the diverted Lake Michigan watershed and the watersheds of northeastern Illinois, 3) knowledge of statistical analyses as applied to hydrology and hydraulics, and 4) experience in flow measurements. The following individuals are not eligible for selection to the committee: any Corps of Engineers employees or any employees or paid consultants of the parties of the US Supreme Court proceedings other than the consultants of the US. 4. SUBMISSION REQUIREMENTS: See Note 24 for general submission requirements. Interested individuals having the capabilities to perform this work must submit two copies of SF 255 (11/92 edition), and two copies of SF 254 (11/92 edition) to the above address not later than the close of business on the 30th day after the date of announcement. If the 30th day is a Saturday, Sunday, or Federal holiday, the deadline is the close of business of the next business day. Include the individual's ACASS number in SF 255, Block 3b. For ACASS information, call 503-326-3459. A project-specific design quality control plan must be prepared and approved by the Government as a condition of contract award, but is not required with the submission. Solicitation packages are not provided. This is not a request for proposal. Fees will be negotiated upon selection. (0224)

Loren Data Corp. http://www.ld.com (SYN# 0035 19970814\C-0007.SOL)


C - Architect and Engineering Services - Construction Index Page