COMMERCE BUSINESS DAILY ISSUE OF AUGUST 15,1997 PSA#1910U. S. Army Corps of Engineers, Omaha District, 215 North 17th Street,
Omaha, NE 68102-4978 Z -- SEEPAGE REMEDIAL TREATMENT, PIPESTEM DAM, JAMESTOWN, NORTH DAKOTA
SOL DACW45-97-B-0047 DUE 092297 POC Contract Support Branch,
402/221-4266 WEB: Omaha District Contracting Division Homepage,
http://ebs.mro.usace.army.mil/EBS/CONTRACT.HTM. E-MAIL: Barbara
Rennert, Barbara.J.Rennert@usace.army.mil. CONSTRUCTION: The Contractor
shall provide all necessary supervision, labor, materials, supplies and
equipment for Seepage Remedial Treatment Project at Pipestem Dam,
Jamestown, North Dakota involves two major items, 1) A relief well
collector system and 2) A subdrinage system. The relief well collector
system consists of installation of approximately 1500 lineal feet of
10-inch dia. hdpe corrugated pipe and 200 lineal feet of 8-inch hdpe
corrguated pipe for the purpose of evacuating water from three (3)
existing relief wells. The subdrainage system consists of installation
of approximately 1200 lineal feet of 8-inch perforated hdpe corrugated
pipe, 270 lineal feet of 10-inch perforated hdpe corrugated pipe and
3670 lineal feet of non-perforated hdpe corrugated pipe for the purpose
of relieving seepage pressures in the right abutment of the dam.
Estimated cost is between $100,000 and $200,000. Contractor will be
required to commence work within 10 days after NTP and complete work in
270 calendar days. Plans and specifications are available. (0225) Loren Data Corp. http://www.ld.com (SYN# 0174 19970815\Z-0012.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|