COMMERCE BUSINESS DAILY ISSUE OF AUGUST 15,1997 PSA#1910Rock Island Arsenal, ATTN: SIORI-CT, ROCK ISLAND, IL 61299-5000 Z -- REPAIR FLOOR -- BUILDING 225, WEST WING PR 32-95 SOL
DAAA08-97-Q-0270 DUE 100697 POC Contract Specialist Tami L. Lord (309)
782-8564 (Site Code DAAA08) PROJECT NUMBER: PR 98-97, LOCATION: Rock
Island Arsenal, Rock Island, IL, Building 225. SCOPE OF SERVICES:
Furnish all plant, labor, equipment, and material for performing all
operations in strict accordance with drawings and Scope of Work for the
repair of floor, Building 225, west bay, first floor. Work includes but
not limited to the following: Provide a dist curtain comprised of 2
inch x 4 inch framing covered with visqueen; revise existing floor
drain system and plumbing; demolish and remove stairs to basement and
enclosure surrounding stairs; sawcut existing floor cap to a 6 inch
depth; demolish and remove floor cap; core drill 6 inch diameter holes,
fill basement with flowable fill; provide 8 inch thick concrete patch;
demolish and remove paving at west overhead doors; provide catch basin
and ductible iron storm sewer; and all pavement joints shall be sawcut
within 12 hours of concrete placement and shall be 2.5 inch deep.
Joints shall be sealed. COST RANGE: Between $25,000 and $100,000. TYPE
OFCONTRACT: Firm Fixed Price Construction. DURATION OF CONTRACT
PERIOD: Commence within 30 calendar days and complete not later than 60
calendar days after receipt of Notice to Proceed. APPROXIMATE ISSUE
DATE: 4 September 1997 with closing date 30 calendar days from issue.
Firms interested in receiving quotation package should FAX (309)
782-6727/3721. All responsible sources may submit a quote which shall
be considered by the agency. The proposed contract listed here is
unrestricted. Home page access: http://www.RIA.ARMY.MIL (0225) Loren Data Corp. http://www.ld.com (SYN# 0211 19970815\Z-0049.SOL)