COMMERCE BUSINESS DAILY ISSUE OF AUGUST 20,1997 PSA#1913DA, Tulsa District, Corps of Engineers, P.O. Box 61, Tulsa, OK
74121-0061 Y -- WINFIELD, KANSAS LOCAL FLOOD PROTECTION PROJECT, WALNUT RIVER AND
TIMBER CREEK, WINFIELD, KANSAS SOL DACW56-97-B-0033 DUE 100797 POC
Diane Cianci, Contract Specialist, 918/669-7270 This work consists of
levee construction along the Walnut River and Timber Creek in Winfield,
Kansas. This work includes clearing and grubbing, common excavation,
construction of 5,790 LF of new earthen levee, increasing the height of
16,140 LF of existing earthen levee, construction of two concrete box
culverts and one 54" RCP culvert all with flap gates and sluice gates,
construction of 1,570 LF of earthen channel, construction of and/or
extension of RCP culverts 18" to 36" diameters, fabrication and
installation of double 7' steel gates, 500 LF of asphaltic concrete
paving, riprap placement, turfing, and construction of 1,570 LF of
chain link fencing. Estimated cost range of this project is $5,000,000
to $10,000,000. An advanced non-refundable fee of $40.00 (reduced
size) and $76.00 (full size) is required for each set of
specifications. Make check payable to F&A Officer, USAED, Tulsa, and
mail to the attention of the Contracting Division. Payment must be
received prior to issuance of plans and specifications. Plans and
specifications will be available on or about September 5, 1997. No
phone calls to order please. All orders will be mailed via first-class
mail. Requests for special handling (Fed-X, etc.) will not be honored.
(0230) Loren Data Corp. http://www.ld.com (SYN# 0107 19970820\Y-0005.SOL)
Y - Construction of Structures and Facilities Index Page
|
|