|
COMMERCE BUSINESS DAILY ISSUE OF AUGUST 27,1997 PSA#19181898 Fort Road Sheridan, WY 82801 Y -- SOLARIUM PROJECT SOL SL-97-24 DUE 092397 POC Brian Thomas (307)
672-1679 Contractor is responsible for the design and construction of
a four season solarium at and East of Building 86 South Entrance. The
structure shall provide a sitting area for up to 20 people, some in
wheelchairs. The structure shall be separate from Building 86 from a
fire protection standpoint, but will be connected with a breezeway to
facilitate pedestrian traffic in inclement weather. Mechanical systems
will be required for heating with abundant ventilation for cooling.
Design should incorporate large glass panels to enhance view and
sections which will open to create an open-air environment in the
summer. 90 day acceptance period required. Issue date of the
solicitation documents is tentatively scheduled for August 26, 1997.
Request for sol. packages must be on Company letterhead. Fax request
are acceptable (307) 672-1681. Subject to availability of funds.
Technical information call Kurt Mayer (307) 672-1670. (0237) Loren Data Corp. http://www.ld.com (SYN# 0118 19970827\Y-0007.SOL)
Y - Construction of Structures and Facilities Index Page
|
|