COMMERCE BUSINESS DAILY ISSUE OF AUGUST 29,1997 PSA#1920USDA, Natural Resources Conservation Service, Formerly USDA, Soil
Conservation Service, 75 High Street, Room 301, Morgantown, WV 26505 Y -- EMERGENCY WATERSHED PROTECTION LOCATED IN PENDLETON, KANAWHA,
CABELL AND LINCOLN COUNTIES, WEST VIRGINIA SOL Exigency EWP DUE 091097
POC Beth Bishop or DeAnn Shoemaker, (304)291-4486 E-MAIL: DeAnn
Shoemaker, Project Clerk, dshoemak@wv.nrcs.usda.gov. EMERGENCY SPILLWAY
REPAIRS -- The work consists of repairing flood damaged areas below the
outlets of the emergency spillways for five floodwater retarding dams
on the South Fork Watershed Project in Pendleton County, West Virginia.
Major items of work include the placement of approximately 18,200 cubic
yards of compacted earthfill; installing 215 tons of rock riprap;
salvaging and installing 20 linear feet of 24 inch diameter corrugated
metal pipe; installing 40 linear feet of 18 inch diameter corrugated
metal pipe; and seeding approximately 12.3 acres of disturbed areas.
The price range for this work is $100,000 to 250,000. Performance time
for this work is 84 calendar days. A pre-bid/site showing will be
conducted on September 3, 1997 at 9:30 a.m. by Kathy Allen, Contracting
Officer's Technical Representative (COTR). Plan to meet at Oak Flat
Ruritan Building located approximately 12 miles East of Franklin, WV at
the intersection Route 33 and Route 3. One contract will be awarded for
all five sites. HERBERT HOOVER HIGH SCHOOL -- The work consists of
reconstructiong a 180 foot section of river bank using select rockfill
embankment material. Rockfill material will be hauled in from an off
site borrow area. Approximately 2,810 cubic yards of rockfill material
is needed. Upon completion of the work all disturbed areas will
receive lime and fertilizer and be seeded and mulched. The price range
for this work is $25,000 to $100,000. Performance time for this work
is 18 calendar days. A pre-bid/site showing will be conducted on
September 4, 1997 at 10:00 a.m. by Sam Ware, COTR. Plan to meet at the
entrance to Herbert Hoover High School Parking Lot -- located
approximately 2 miles South of Clendinin, WV on Rotue 119. One contract
will be awarded for this site. CABELL SITE 101 & LINCOLN SITE 101 --
This solicitation contains work on two Emergency Watershed Protection
Sites. CABELL SITE 101 is located along the Mud River, 0.4 miles
southeast of Milton, Cabell County, West Virginia at the end of George
Avenue off of Co. Route 25. The sites consist of 360 feet of rock
riprap streambank protection needed to stabilize two streambank slips
endangering three homes. The work consists of minor clearing &
grubbing, installation of 80 feet of 4 inch PVC pipe, and installation
of approximately, 1,491 tons of Rock Riprap. LINCOLN SITE 101 is
located along Trace Fork, 0.4 miles West of the Junction of Route 4 and
Route 34, Lincoln couty, WV. The site consists of 180 feet of Rock
riprap protection. The work consists of Clearing & Grubbing, and
installation of approximately 652 tons of Rock Riprap. The price range
for this work is $25,000 to $100,000. Performance time for this work
is 23 calendar days. A pre-bid/site showing will be conducted on
September 5, 1997 at 9:00 a.m. by Harvey Mitchell, COTR. Plan to meet
at the Milton City Hall in Milton, WV. Take I-64 to Exit 28, Milton,
turn South on John's Creek Road, then turn West on Route 60 at
intersection, proceed 1/4 mile to light at Smith Street, turnnorth on
Smith Street, Milton City Hall is on the right. One contract will be
awarded for both sites. CABELL COUNTY SITE 102, 103, 104, 105, 106 &
107 -- This solicitation will contain work on six (6) Emergency
Watershed Protection Sites located in Cabell County, WV. The work
primarily consists of obstruction removal and regrading, although Site
102 will receive approximately 1,444 tons of rock riprap. The price
range for this work is $25,000 to $100,000. Performance time for this
work is 24 calendar days. A pre-bid/site showing will be conducted on
September 5, 1997 at 9:00 a.m. by Harvey Mitchell, COTR. Plan to meet
at the Milton City Hall in Multon, WV. Take I-64 to Exit 28, Milton,
turn South on John's Creek Road, then turn West on Route 60 at
intersection, Proceed 1/4 mile to light at smith Street, Turn north on
Smith Street, Milton City Hall is on the right. One contract will be
awarded for all 6 sites. There will be no other scheduled pre-bid
confrences. All responsible sources may submit a bid, proposal, or
quotation which will be considered by the agency. SOLICITATION
DOCUMENTS WILL ONLY BE AVAILABLE AT THE PRE-BID/SITE SHOWING. (0239) Loren Data Corp. http://www.ld.com (SYN# 0100 19970829\Y-0004.SOL)
Y - Construction of Structures and Facilities Index Page
|
|