COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 3,1997 PSA#1922Fleet & Industrial Supply Center, Regional Contracts Dept, Attn: Bid
Officer/Code 210A94, 937 N. Harbor Drive, Suite 212, San Diego, CA
92132-0212 36 -- BALER SOL N00244-97-Q-A786 DUE 091297 POC Bid Officer
619-532-2690, 619-532-1088 (fax); Contract Specialist Bill Archambeault
WEB: Click here to find more information of FISC San Diego,
http://www.sd.fisc.navy.mil. E-MAIL: Click here to contact Contract
Specialist 619-532-2894; 619-532-2347 (fax),
bill_archambeault@fmso.navy.mil. This is a combined synopsis /
solicitation for commercial items prepared in accordance with the
format in Subparts 12.6 and 13, as supplemented with additional
information included in this notice. This announcement constitutes the
only solicitation to be issued; proposals are being requested and a
written solicitation will not be issued. The solicitation number for
this Request For Quote is N00244-97-Q-A786. This solicitation and
incorporated provisions and clauses are those in effect through Federal
Acquisition circular 46. This solicitation is issued on a restricted
basis. The Standard Industrial Code is 3559 and applies to businesses
with less than 500 employees. FISC San Diego has a requirement for two
balers. Statement of work / specifications: 1) First unit requirement
is one cardboard baler, with salient characteristics of MAX-PAK Model
MP-60E or equivalent, 2) Materials to be baled are cardboard and
newspapers, averaging 5 to 10 tons/week, 3) Motor not less than 10 HP,
cycle time not longer than 47 seconds, and cylinder diameter not less
than 6", 4) 460V, 3 phase electrical, 5) Bale size not to exceed 60"x
30"x 48", 6) Bale weight not to exceed 800-1200 lbs., 7) NEMA type 12
electrical enclosures are required, 8) Baler shall meet or exceed all
ANSI and OSHA standards for balers, 9) Requires baling wire: 25
bundles @ 250 wires per bundle or 50 bundles @125 wires per bundle, to
be delivered with unit, 10) Second unit requirement is one baler, with
salient characteristics of MAX-PAK Model MP-60HD or equivalent, 11)
Materials to be baled are aluminum cans, plastic bottles, corrugated
cardboard, and various types of paper products, averaging 5 to 10
tons/week, 12) Motor not less than 20 HP, cycle time not longer than 40
seconds, and cylinder diameter not less than 10", 13) 460V, 3 phase
electrical, 14) Bale size not to exceed commercially acceptable size,
15) Bale weight not to exceed 800-2000 lbs., 16) NEMA type 12
electrical enclosures are required, 17) Baler shall meet or exceed all
ANSI and OSHA standards for balers, 18) Requires baling wire: 25
bundles @ 250 wires per bundle or 50 bundles @125 wires per bundle, to
be delivered with unit. FOR BOTH UNITS: 19) Provide a site
requirements list for installation within 14 days after award of
contract. Preparation of site will be completed by requiring activity.
20) Contractor will provide 14 days notice prior to delivery of
equipment, 21) Delivery to be made within 60 days after award of
contract, 22) Four sets of technical manuals shall be delivered with
equipment. Manuals shall be the manufacturer's standard commercial
publication, 23) Contractor shall install the equipment at the
requiring activity within 20 days after delivery, 24) Contractor will
provide all labor and resources necessary for installation. Requiring
activity will provide an electrician to connect power IAW local
regulations, 25) Contractor will validate installation within 25 days
of delivery by operating equipment in all modes and evolutions for
which it is intended, and verify performance is within design
parameters. Operating time shall not be less than 4 hours, 26)
Contractor shall provide eight hours of training for personnel at the
receiving activity after installation and start-up, and within 30 days
of delivery of equipment. Contractor shall provide all labor and
resources for training, and shall have a prepared training agenda.
Training shall be conducted by an expert in the operation and
maintenance of the equipment, and will include warranty provisions
related to the equipment. The contractor's Operation and Maintenance
Manual shall be used as a training aid, 27) Warranty period shall not
be less than 12 months, to begin on the date shown on the proof of
shipping, 28) When specific items are not stated herein, all items
listed as standard equipment in the contractor's published
specification brochures and catalogs shall be furnished, 30) Delivery
is to Naval Submarine Base New London, Groton, CT. Inspections and
acceptance of material will be done by the receiving officer. The
following clauses and provisions are applicable and hereby incorporated
into the solicitation by reference and will be provided by the
contracting officer in full text upon request. FAR 52.212-1; FAR
52.212-3; FAR 52.212-4; FAR 52.212-5; FAR 52.222-26; FAR 52.222-35; FAR
52.222-36; FAR 52.222-37; DFAR 252.212-7001, Contract terms and
conditions; DFAR 252.225-7001, Buy American Act Balance of Payments;
DFAR 252.225-7036, North American Free Trade Agreement Implementation
Act. Responses from responsible offerors and inquiries may be faxed to
Bill Archambeault at 619-532-1088 or to the Bid Officer. No phone
calls, please.**** (0240) Loren Data Corp. http://www.ld.com (SYN# 0232 19970903\36-0002.SOL)
36 - Special Industry Machinery Index Page
|
|