|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 9,1997 PSA#1926USASOC, DCOFS Acquistion And Contracting, Bldg. E-2929, Room 114, Fort
Bragg, NC 28307-5200 J -- MAINTENANCE/REPAIR AND PARTS REPLACEMENT OF PA-31T CHEYENNE II
AIRCRAFT DUE 092297 POC Contract Specialist, Jerry G. Lambert,
(910)432-6978, Contracting Officer, Jane H. Sutherlin, (910)432-2146
This is a notice of intent to negotiate a contract on a sole source
basis with Stevens Aviation, Inc., P.O. Box 12349, Greenville,SC
29612-0349 to provide the following services/supplies: Scheduled and
unscheduled maintenance as required on Aircraft PA-31T Piper Cheyenne
II, SN:85-51609 for the period 1 October 1997 though 30 September 1998
(or date of award subsequent thereto) for the U.S. Army Special
Operations Command, Fort Bragg, NC (This is the aircraft's homebase).
This includes all parts and labor required to maintain the aircraft to
Federal Aviation Administration (FAA) and U.S. Army Standards. THIS
WILL BE A TIME AND MATERIALS TYPE CONTRACT. Labor hour are to be
proposed as loaded (with Overhead and General & Administrative (G&A)
Expense (if any) included). The following is a brief (but not
inclusive) description of services/supplies: a. Maintenance --
Receiving, de-cowling, cleaning, inspection, replacing oil, fuel, air,
and hydraulic filters, and final inspection for 100-Hour Events and
unscheduled maintenance. Routine service bulletins and repairs that are
considered minor, such as inspecting shall be included at a flat rate
labor charge. b. Avionices Support -- maintain and repair the basic
communication, navigation, and weather radar as defined in their
particular illustrated parts and maintenance manuals for each
particular instrument/radio/telephone (Bendix Autopilot, Bendix Radar,
King Avionics, Wolfsburg Flight Fone 6). c. Parts -- includes
procurement, overhaul, and repair of spare parts to maintain the
aircraft spare parts stock to an acceptable level. d. Engine
Hot-Section Inspection and Repair -- includes the labor to perform
engine hot section inspection as required by Pratt and Whitney or as
deemed necessary by engine performance (Cost of parts to repair hot
section IS NOT included). Repair facility must be within One (1) Hour
Flying Time of Fort Bragg, NC 28307 the home base of PA-31T Piper
Cheyenne II SN: 85-51609 aircraft. Interested parties may identify
interest and capability by submitting technical and pricing data within
15 days of publication of this notice. This notice of intent is not a
request for competitive proposals. However, all proposals received
within 15 days after date of publication of this synopsis will be
considered by the Government. A determination by the Government not to
compete this proposed contract based upon responses to this notice is
soley within the descretionn of the Government. Information received
will normally be considered solely for the purpose of determining
whether to conduct a competitive procurement.***** (0247) Loren Data Corp. http://www.ld.com (SYN# 0040 19970909\J-0003.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|