Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 10,1997 PSA#1927

PROPERTY MANAGEMENT DIVISION, GENERAL SERVICES ADMINISTRATION, 10 CAUSEWAY ST., ROOM 985, BOSTON, MA 02222-1077

Z -- NEW ELEVATOR AND INTERIOR SPACE ALTERATIONS AT THE BRATTLEBORO, VERMONT SOL GS01P97BZC0070 DUE 111397 POC Contract Specialist, Sarah A. Robinson, (617)565-6013 Demolition, hazardous materials abatement and civil, structural, architectural mechanical and electrical work required for the renovation of a portion of the third floor of the building and the installation of a vehicle sallyport and an elevator to connect the sallyport to the third floor renovated space. Estimated cost rage is between $1,000,000 and $5,000,000. Issued date on about 10/8/97. Pre Bid Construction Conference on or about 10/22/97. Bid Opening Date is on or about 11/13/97. Estimated time for completion is 300 Calendar Days. All Requests for the Solicitation Package must be made in writing, either by mailing to the above address or via fax at (617) 565-7145. Attn: Sally Robinson, No . P.O. Box Addresses. (0251)

Loren Data Corp. http://www.ld.com (SYN# 0190 19970910\Z-0026.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page