|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 10,1997 PSA#1927PROPERTY MANAGEMENT DIVISION, GENERAL SERVICES ADMINISTRATION, 10
CAUSEWAY ST., ROOM 985, BOSTON, MA 02222-1077 Z -- NEW ELEVATOR AND INTERIOR SPACE ALTERATIONS AT THE BRATTLEBORO,
VERMONT SOL GS01P97BZC0070 DUE 111397 POC Contract Specialist, Sarah A.
Robinson, (617)565-6013 Demolition, hazardous materials abatement and
civil, structural, architectural mechanical and electrical work
required for the renovation of a portion of the third floor of the
building and the installation of a vehicle sallyport and an elevator to
connect the sallyport to the third floor renovated space. Estimated
cost rage is between $1,000,000 and $5,000,000. Issued date on about
10/8/97. Pre Bid Construction Conference on or about 10/22/97. Bid
Opening Date is on or about 11/13/97. Estimated time for completion is
300 Calendar Days. All Requests for the Solicitation Package must be
made in writing, either by mailing to the above address or via fax at
(617) 565-7145. Attn: Sally Robinson, No . P.O. Box Addresses. (0251) Loren Data Corp. http://www.ld.com (SYN# 0190 19970910\Z-0026.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|