COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 12,1997 PSA#1929USACFSC/NAF Contracting Directorate, 2760 Eisenhower Avenue, Suite 402,
Alexandria, VA 22314-4569 Y -- CONSTRUCTION OF HOTEL ADDITION AT DRAGON HILL LODGE, SEOUL KOREA
SOL NAFBA1-97-CR-0055 DUE 100197 POC James H. Featherer (703) 325-0757
AMENDMENT TO PREVIOUS The U.S. Army Community and Family Support Center
(USACFSC) NAF Contracting Directorate is soliciting a qualified
construction manager to be the single source contract entity for
providing a fixed price proposal which assumes complete responsibility
for the management and construction of an expansion to Dragon Hill
Lodge which is located in Yongsan Army Garrison, Seoul, South Korea.
Project encompasses construction of a six (6) story 95 guest-room
addition with an expanded lobby and general purpose spaces, expansion
of mechanical/electrical building and systems including 100% standby
power, a new south entrance to the Lodge facility, and a 233 space
bi-level parking garage. This project shall be done using U.S. Building
Codes and Standards, while complying with the provisions of the Status
of Forces Agreement (SOFA), and implemented through subcontracts with
Korean construction firms helping to accomplish the actual
construction work. The construction managment constractor shall be a
U.S. firm and have had experience as a General Construction Contractor,
Construction Project Manager, and have had a working or joint venture
relationship with a Korean construction contractor in accomplishing
multi-million dollar similiar type projects within the past 5 years.
The magnitude of construction is more than 10,000,000.00 dollars.
Interested firms wishing to be considered as a pre-qualified bidder
shall submit their qualifications and similar project experience on
form AIA document A305 "Contractor Qualification" along with the
following information addressed specifically to the above mentioned
scope of work: 1. Experience, qualifications, and professional
registration/affiliation of individual team members that will be
assigned to this project. Address experience of these on similar
projects of similar scope for each of the team members (i.e.: Project
Director, Engineer, and Superintendent(s) or other appropriate team
members) 2. Describe and chart the organizational/management structure
proposed for this project including roles of individual team members,
for the proposing construction manager, and each of the selected
Korean subcontractors. 3. Team's collective experience on similar
projects (within the past 5 years) including hotel additions, parking
structures, mechanical/electrical retrofits and experience with
performing renovation while keeping an exsiting hotel in operation. 4.
Construction manager's experience with work on military installations.
5. Construction Manager's description of approach to the project and
how they will do the work including, project management, quality
assurance program and owner communication as to project schedule and
construction progress. 6. Firm's safety management program to include
safety records over the past 5 years. The above information will be
sent to NAF Contracting Directorate, ATTN: Mr. James Featherer, 2760
Eisenhower Avenue Suite 402, Alexandria, Virginia 22314 to be received
no later than 01 October 1997. (0253) Loren Data Corp. http://www.ld.com (SYN# 0149 19970912\Y-0005.SOL)
Y - Construction of Structures and Facilities Index Page
|
|