|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 16,1997 PSA#1931SOUTHWESTNAVFACENGCOM, 1220 Pacific Highway, San Diego, CA 92132-5187 C -- GEOTECHNICAL CONSULTATION, SUBSURFACE INVEST, ENVIRON SOILS
INVESTIG, & MATERIAL TESTING SRVCS FOR VARIOUS PROJECTS IN CA, NV, AZ,
& NM SOL N68711-97-D-8830 DUE 101397 POC S. Darella, Contract
Specialist, Code 57CS4.SD (619)532-3758 E-MAIL:
ssdarella@efdswest.navfac.navy.mil, ssdarella@efdswest.navfac.navy.mil.
Indefinite Quantity Contract. Engineering Services are required for
geotechnical consultation, subsurface investigation, environmental
soils investigation, and material testing services for various Naval
and Marine Corps. activities within the California, Nevada, Arizona,
and New Mexico geographic areas for Southwest Division, Naval
Facilities Engineering Command, San Diego, California. The length of
the contract will be 365 days from the date of the contract award or
until the $500,000 limit is reached. After the first 365 days, the
government has the option to extend this contract for an additional 365
days or until an additional $500,000 is reached. The A-E fee for any
one project shall not exceed $200,000. If the government exercises the
option to extend the contract, the total amount of the contract shall
not exceed $1,000,000. The minimum contract amount will be $25,000.
The lead discipline shall be a geotechnical firm with all required
supporting disciplines. The estimated start dated for this contract is
December 1997. The estimated completion date for this contract is
December 1998 with an option available to the government to extend the
contract for one additional year until December 1998. A-E selection
criteria will include (in order of importance): (1) Recent specialized
experience of the firm (including consultants) in geotechnical
engineering, subsurface and environmental soils investigation, and
material testing services. Do not list more than a total of 10 projects
in block 8 of the SF 254 and 255. Indicate which consultants from the
proposed team, if any, participated in each project. (2) Professional
qualifications of the staff and consultants to be assigned to this
project shall include the experience in geotechnical consultation,
subsurface and envrionmental soils investigations, and environmental
soils laboratory analysis. List only the team members who actually will
perform major tasks under this project and qualifications should
reflect the individual's potential contributions to this project. (3)
Past performance on contracts with Government agencies and private
industry in terms of cost control, quality of work and compliance with
performance schedules; indicated by briefly describing internal
quality assurance and cost control procedures and indicate
effectiveness by listing budget/estimated construction costs, award
amount, final design estimate and construction change order rate for up
to five recent projects; and list recent awards, commendations and
other performance evaluations (do not submit copies). (4) Location in
the general geographic area of the project and knowledge of the
locality in relation to Naval and Marine Corp. locations, provided that
the application of this criterion leaves an appropriate number of firms
given the nature and size of the projects. (5) Capacity to accomplish
the work in the required time; indicate the firms present workload and
the availability of the project team(including consultants) for the
specified contract performance period; and indicate specialized
equipment available and prior security clearances. (6) Demonstrated
success in prescribing the use of recovered materials and achieving
waste reduction. (7) List the small or disadvantaged or woman-owned
business firms used as primary consultants or as subconsultants. If a
large business concern is selected for this contract, they will be
required to submit a subcontracting plan that should reflect a minimum
5% Small Disadvantaged Business of the amount to be subcontracted out.
Those firms which meet the requirements described in this announcement
and wish to be considered, must submit one copy each of a SF 254 and
a SF 255 for the firm and a SF 254 for each consultant listed in block
6 of the firms SF 255. One copy of the submittal package is to be
received in this office no later than 3:00 PM Pacific Time on the date
indicate above. Should the due date fall on a weekend or holiday, the
submittal package will be due the first workday there after.
Submittals received after this date and time will not be considered.
Additional information requested of applying firms: indicate
solicitation number in block 2b, CEC (Contractor Establishment Code)
and/or Duns number (for address listed in block 3) and TIN number in
block 3, telefax number (if any) in block 3a and discuss why the firm
is especially qualified based on the selection criteria in block 10 of
the SF 255. For firms applying with multiple offices, indicate the
office which completed each of the projects listed in block 8 and list
which office is under contract for any contracts listed in block 9.
Use block 10 of the SF 255 to provide any additional information
desired. Personal interviews may not be scheduled prior to selection of
the most highly qualified firm. SF 255's shall not exceed 30 printed
pages (double sided is two pages/organizational charts and photographs
excluded, exception: photographs with text will be considered as a
page). All information must be included on the SF 255 (cover letter,
other attachments and pages in excess of the 30 page limit will not be
included in the evaluation process). Firms not providing the requested
information in the format (i.e. listing more than a total of 10
projects in block 8, not providing a brief description of the quality
control plan, not listing which office of multiple office firms
completed projects listed in block 8 in block 10, and not listing the
criteria elements as stated in the synopsis in block 10, etc.) directed
by this synopsis may be negatively evaluated under selection criteria
(3). Firms, their subsidiaries or affiliates, which design or prepare
specifications for a construction contract or procurement of supplies
cannot provide the construction or supplies. This limitation also
applies to subsidiaries and affiliates of the firm. This is not a
request for proposal. Telegraphic and facsimile SF 255's will not be
accepted. Site visits will not be arranged during the submittal period
(0254) Loren Data Corp. http://www.ld.com (SYN# 0019 19970916\C-0003.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|