COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 14,1997 PSA#1950Commander (vpl), USCG, Maintenance and Logistics Command Atlantic, 300
East Main Street, Suite 600, Norfolk, VA 23510-9102 J -- DRYDOCK AND DOCKSIDE REPAIRS FOR THE USCG 140 FOOT CUTTERS FOR
THE EAST COAST AREA SOL DTCG80-98-B-3FA707 DUE 101097 POC Contact Mr.
Barat Beachle, Contract Specialist (757) 628-4652 Provide all labor,
material, equipment and services for Drydock and Dockside Repair for
the USCG 140 FOOT CUTTERS located within the East Coast. This
requirement may result in the award of multiple contracts. Contracts
will be Requirements Type Contracts. Contracts will be for a Basic Year
with Four (4) Option Years, to be exercised at the Coast Guard's
discretion. The items which may be performed but are not necessarily
limited to Drydock Repairs and Dockside Repairs are as follows: (1)
Welding Repairs, (2) Air Test Various Compartments, (3) Remove Lower
Rub Rail, (4) Seachest Strainer Stud Modification, (5) Overhaul and
Test Pilothouse Doors, (6) Renew Doors, Hatches, and Scuttles, (7)
Erect Mast Staging, (8) Renew Mast Support Cables, (9) Clean In-Place
Main Propulsion Motor and Main Propulsion Generator, (10) Renew Main
Propulsion Motor, (11) Inspect and Align Propulsion Motor and Shaft,
(12) Perform a Load Test of the #1 and #2 Propulsion Generators, (13)
Remove Inspect, and Reinstall Propeller Shaft, (14) Renew Shaft
Coupling Bolts and Machine Shaft Coupling, (15) Overhaul Shaft Seal,
(16) Renew Shaft Covering, (17) Straighten Shaft, (18) Renew Stern Tube
Bearings and Staves, (19) Renew Shaft Sleeves, (20) Main Motor Thrust
Bearing Modification, (21) Remove, Inspect, and Reinstall Propeller,
(22) Minor Repair and Recondition Propeller, (23) Clean and Inspect
Heat Exchangers, (24) Clean Exhaust Stacks and Spark Arrestors, (25)
Clean In-Place Ships Service Generator, (26) Remove, Clean, Dip, Bake
and Reinstall Ship's Service Generator, (27) Renew Radar Pedestal, (28)
Preserve the Transducers Hull Ring and Renew the Depth Indicating
Transducers, (29) Renew RG-394/U Radar Waveguide, (30) Test and Adjust
Relief Valves, (31) Clean Engine Room Supply Ventilation System, (32)
Overhaul Engine Room Ventilation Fans and Dampers, (33) Overhaul
Blower Motor on Maim Motor, (34) Clean Galley Exhaust Ventilation
System and Overhaul Ventilation Fan, (35) Auxiliary Machine Space 2
Ventilation Reconfiguration, (36) Modify Motor Room and Aft Steering
Ventilation Systems, (37) Clean and Test Auxiliary Boilers and Heater
Units, (38) Overhaul, Renew and Test Valves, (39) Inspect and Test Air
Receivers, (40) Remove Halon 1301 System, (41) Aqueous Film Foaming
Foam (AFFF) Modification, (42) Overhaul Steering Pump Motors, (43)
Overhaul Steering Pumps, (44) Inspect Steering System (45) Inspect and
Test Steering System Relief Valves, (46) Remove, Inspect, and
Reinstall Rudder Assembly, (47) Renew Rudder Bearings, (48) Inspect,
Test, and Overhaul Weight Handling Equipment, (49) Overhaul Anchor
Windlass Assembly, (50) Overhaul Anchor and Anchor Chain, (51) Overhaul
Warping Capstan Assembly, (52) Inspect and Renew Draft Marks, (53)
Preserve Stern Tube, (54) Preserve Chain Locker, (55) Clean and Inspect
Diesel Fuel and Lube Oil Tanks, (56) Sandblast Diesel Fuel and Lube Oil
Tanks, (57) Clean and Inspect Voids and Ballast tanks, (58) Preserve
Voids and Ballast Tanks, (59) Clean and Inspect Sewage Collection and
Holding Tank, (61) Clean,Inspect, and Disinfect Potable Water Tanks,
(62) Preserve Potable Water Tanks, (63) Preserve Underwater Body, (64)
Electronics Gear Locker Modification, (65) Preserve Freeboard, (66)
Preserve Weather Decks, (67) Preserve Superstructure, (68) Preserve
Main Mast, Fore Mast, and Stub Mast, (69) Renew Corrosion Preventive
Zinc Anodes, (70) Install New Deck Coverings, (71) Reconfigure Crew's
Washroom, (74) Chart Table Relocation, (75) Service Liferafts and
Hydrostatic Releases, (76) Small Arms Locker Installation, (77) Perform
Inclining Experiment, (78) Ultrasonic Testing, (79) Clean Bilges in
Various Compartments, (80) Provide Temporary Logistics, (81) Routine
Drydocking. It is anticipated that there may be two (2) Dockside
Availabilities and two (2) Drydock availabilities per year. The 140
FOOT CUTTERS include USCGC MORRO BAY, THUNDER BAY, STURGEON BAY,
PENOBSCOT BAY. The Government obligation under this solicitation is
contingent upon availability of appropriated funds for which payment
for contractual purposecan be made. The place of performance is
restricted to no open water transit. All referenced documents are
available for viewing at 30 East Main Street, Suite 600, Norfolk, VA.
A charge of $100.00 is required in the form of a certified check or
money order made payable to the U.S. Coast Guard for requested
drawings. All businesses, large and small are encouraged to submit bids
for the subject requirement under the Small Business Competitiveness
Demonstration Program. Plans and specifications will be issued on or
after 27 Oct 97 97. All responsible sources may submit a bid which
shall be considered by the United States Coast Guard. "This Notice is
for informational purposes for Minority, Women-Owned and Disadvantaged
Business Enterprises: The Department of Transportation (DOT) Office of
Small and Disadvantaged Business Utilization (OSDBU) has a program to
assist minority, women-owned and disadvantaged business enterprises to
acquire short-term working capital assistance for
transportation-related contracts. Loans are available under the DOT
Short Term Lending Program (STLP) at prime interest rates to provide
accounts receivable financing. The maximum line of credit in $500,000.
For further information and applicable forms concerning the STLP,
please call (800) 532-1169. For information concerning the acquisition,
contact the contracting official listed above. SEE Note 26.**** (0282) Loren Data Corp. http://www.ld.com (SYN# 0046 19971014\J-0011.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|