COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 17,1997 PSA#1953USDA-Natural Resources Conservation Service, 101 South Main Street,
Temple, Texas Y -- CONSTRUCTION OF A FLOODWATER RETARDING STRUCTURE SOL NRCS-1-TX-98
DUE 120597 POC James Stautzenberger, (817) 334-5258, Ext. 3507, or
Martin Schmidt (254) 298-1229 CONSTRUCTION of a Floodwater Retarding
Structure at Site 17, Red Deer Creek Watershed, located approximately
10.8 miles southwest of Canadian, Hemphill County, Texas. Estimated
quantities of the major items of work are: Excavation, common, 149,270
Cu.Yd.; Earthfill, embankment, 302,630 Cu.Yd.; Drainfill, graded,
2,622 Cu.Yd.; Salvaging and Placing Topsoil, 23,530 Sq.Yd.; Concrete,
111 Cu.Yd.; Reinforcement, steel bar, 9,000 Lb.; Pipe, concrete,
pressure, 260 Linear Ft.; Rock riprap, 99 Tons; Fences, barbed wire,
5,450 Linear Ft.; Soil-Cement, 7,655 Cu.Yd.; Cement for Soil-cement,
24,880 CWT; Water for Dust Abatement and Haul Road Maintenance, 2,750
1000 Gal.; and Lump Sum Items for Mobilization, Clearing, Construction
Surveys, Pollution Control, Contractor Quality Control, Development of
Water Supply System, and Vegetative Measures. Estimated Price Range is
$1,000,000.00 to $5,000,000.00. Performance time is 353 calendar days.
All responsible sources may submit a bid which shall be considered by
the agency. (0288) Loren Data Corp. http://www.ld.com (SYN# 0088 19971017\Y-0003.SOL)