COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 17,1997 PSA#1953USDA-Natural Resources Conservation Service, 101 South Main Street,
Temple, Texas Y -- CONSTRUCTION OF A FLOODWATER RETARDING STRUCTURE SOL NRCS-2-TX-98
DUE 120597 POC James Stautzenberger, (817) 334-5258, Ext. 3507, or
Martin Schmidt (254) 298-1229 CONSTRUCTION of a Floodwater Retarding
Structure at Site 18, Red Deer Creek Watershed, located approximately
9.5 miles southwest of Canadian, Hemphill County, Texas. Estimated
quantities of the major items of work are: Excavation, common, 104,900
Cu.Yd.; Earthfill, embankment, 141,100 Cu.Yd.; Drainfill, graded,
1,465 Cu.Yd.; Salvaging and Placing Topsoil, 20,500 Sq.Yd.; Concrete,
55.3 Cu.Yd.; Reinforcement, steel bar, 6,874 Lb.; Pipe, concrete,
pressure, 24" I.D., 220 Linear Ft.; Rock riprap, 71 Tons; Fences,
barbed wire, 4,300 Linear Ft.; Soil-Cement, 3,567 Cu.Yd.; Cement for
Soil-cement, 11,595 CWT; Clearing, 33 Acres; Water for Dust Abatement
and Haul Road Maintenance, 2,468 1000 Gal.; and Lump Sum Items for
Mobilization, Construction Surveys, Pollution Control, Contractor
Quality Control, Development of Water Supply System, and Vegetative
Measures. Estimated Price Range is $500,000.00 to $1,000,000.00.
Performance time is 234 calendar days. All responsible sources may
submit a bid which shall be considered by the agency. (0288) Loren Data Corp. http://www.ld.com (SYN# 0097 19971017\Y-0012.SOL)