COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 27,1997 PSA#1959Department of the Navy, Naval Sea Systems Command, 2531 Jefferson Davis
Highway, Arlington, VA 22242-5160 19 -- SMALL WATERPLANE AREA TWIN HULL (SWATH) OCEANOGRAPHIC RESEARCH
VESSEL SOL N00024-98-R-2304 POC Contracting Officer, Melvin Jones,
703/602-7518/Negotiator, Dea Merchant, 703/602-7518 The Naval Sea
Systems Command (NAVSEA) plans to release a solicitation for design and
construction of a developmental Small Waterplane Area Twin Hull (SWATH)
oceanographic research vessel. This solicitation will not be posted to
the NAVSEA homepage; it will only be distributed to sources who
express an interest in the effort. This solicitation will lead to an
agreement with the successful offeror using the provisions of 10 U.S.C.
2371 and Public law 103-160, Section 845, Other Transactions Authority,
as amended by Section 804 of Public Law 104-201. This authority allows
for non-traditional contract approaches, outside the purview of the
Federal Acquisition Regulations, that more closely parallel industry
practice. The purpose for using this authority is to encourage industry
participation and maximize the efficient use of limited funds. One
industry team will be selected to complete a two phase effort. Phase I
will be awarded at a firm fixed price and Phase II is planned as a
contract option with a notto exceed price. After Government approval of
Phase I, the Phase II option will be negotiated at a firm fixed price.
Award is anticipated in the second quarter FY 98 and approximately
$45M has been appropriated for the total effort. The Navy will use
Integrated Product Teams (IPT's) for this program. The teams will
consist of Government representatives and the industry team we are
seeking. This ship is expected to replace the aging and technically
obsolete Navy owned, university operated, research vessel, R/V MOANA
WAVE (AGOR 22). It is anticipated that this ship will operate in
coastal and deep ocean areas and conduct general purpose oceanographic
research. Program phases for development of the SWATH AGOR include:
Phase I -- Ship Definitization Phase: During this phase the IPTs will
work together to optimize desired ship capabilities within a specific
cost cap. Work required during Phase I will include, but may not be
limited to the following: budget breakdown, integrated management plan,
ILS cost/performance trade-off studies, finalize ship requirements,
point design, some design development beyond the point design stage,
performance specification development, and life cycle cost estimates.
Phase II -- Design and Construction Phase. Work required during Phase
II will include, but may not be limited to the following: perform model
testing, complete any detail design necessary to construct the vessel,
purchase all necessary material, and develop pre and post delivery
trial plans. In addition, this phase will include lofting or other
production design, fabrication, erection and outfitting of the ship,
and system testing including all pre and post delivery trials to
determine all ship performance and mission capabilities. Industry teams
interested in this solicitation must respond in writing to the
Contracting Officer. Responses shall be addressed to Commander, Naval
Sea Systems Command, Attn: LCDR Mel Jones, SEA 02232, RM 5S18, 2531
Jefferson Davis Highway, Arlington, VA 22242-5160, or send via e-mail
to Jones_ Melvin_G_LCDR@HQ.NAVSEA.NAVY.MIL. (0296) Loren Data Corp. http://www.ld.com (SYN# 0128 19971027\19-0001.SOL)