Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 29,1997 PSA#1961

Department of the Air Force, 436 Contracting Squadron, 639 Atlantic Street, Dover AFB, DE 19902-5639

J -- REPAIR OF TEST STANDS SOL F07603-98R6001 DUE 110497 POC Sheila Waddell, Contracting Specialist, 302-677-5216 E-MAIL: SHEILA WADDELL, waddell@lgc436.dover.af.mil. This is an amendment to the initial CBD Notice issued on 8 Oct 97. The scope of this project requires the following amendment be incorporated in the Request for Quote. 1. The subject project documents are amemded as follows : a. Drawings: (1) Sheet E1, Note 2: Delete the second sentence, "The Contractor may reuse existing light fixtures, mounting plates and conduit where possible". (2) Sheet E1, Note 3: Delete the word "only". (3) Sheets E2 and E3, Note 2 on both: Change last sentence to read: "The Contractor shall provide wire mesh grips on all cable connectors installed". (4) Sheet E3, Note 1: Delete the second sentence, "The Contractor shall reuse existing lights where possible". (5) Sheet E1: Add new Note 8 to read: The cables supplying power to the stands listed below shall have cables installed at the specified lengths and sized appropriately as per the NEC. Stand Number Quantity Cable Length 9 2ea 100 Feet 12 1ea 100 Feet 1ea 75 Feet 13 1ea 100 Feet 29 2ea 100 Feet 32 2ea 75 Feet 33 1ea 100 Feet b. Specifications: (1) Change para 1.02 to read: "The project consists essentially of, but is not limited to, replacing all the existing electrical power and lighting circuits on 28 aircraft maintenance stands to include conduit, wiring, lighting fixtures, mounting plates, devices, receptacles, cords, plugs and associated hardware as per the specifications, drawings, technical orders (T.O.) 35D34-8-1 (Change 12, 15 Jul 94) and TO 35D34-8-4 (Change 8, 1 Jun 94), and the National Electric Code (NEC)." (2) Para 1.07: Add "In the event of a conflict, and unless otherwise directed by the Contracting Officer, the Specifications take precedence over the drawings." (3) Delete para 1.11A. (4) Para 3.7: Add new sub paragraph 3.7.1.1: "The lighting fixtures will be replaced with complete Killark 150 watt HPS fixtures P/N EZS150A2-T, guard P/N EZG1, Standard Dome Reflector P/N VMPSD-40 and Lamps." (5) Para 3.9: Change to read: "3.9 TESTS 3.9.1 Operating Tests: After the installation is completed, and as such time as the Contracting Officer may direct, the Contractor shall conduct operating tests for approval. The equipment shall be demonstrated to operate in accordance with the specified requirements. 3.9.2 Field Tests: The Contractor shall notify the Contracting Officer at least 2 calendar days prior to conducting field tests. The Contractor shall furnish all materials, labor, and equipment necessary to conduct field tests. The Contractor shall perform all tests and inspections recommended by the manufacturer unless specifically waived by the Contracting Officer. The Contractor shall maintain a written record of all tests which includes date, test performed, personnel involved, devices tested, serial number and name of test equipment and test results. All field test reports will be signed and dated by the Contractor. 3.9.2.1 Safety: The Contractor shall provide and use safety devices such as rubber gloves, protective barriers, and danger signs to protect and warn personnel in the test vicinity. The Contractor shall replace any devices or equipment which are damaged due to improper test procedures or handling. 3.9.2.2 Cable Tests: The Contractor is responsible for identifying all equipment and devices that could be damaged by application of the test voltage and ensuring that they have been properly disconnected prior to performing insulation resistance testing. An insulation resistance test shall be performed on all low and medium voltage cables after the cables are installed in their final configuration and prior to energization. The test voltage shall be 500V DC applied for one minute between each conductor and ground and between all possible combinations of conductors. The minimum value of resistance shall be: R in megohms = (rated voltage in kV + 1) x 304,800/length of cable in meters. (R in megohms = [rated voltage I kV +1] x 1000/length of cable in feet. Each cable failing this test shall be repaired or replaced. The repaired cable system shall then be re- tested until failures have been eliminated. 2. THE SOLICITATION NUMBER FOR SUBJECT REQUEST FOR QUOTE, MAINTENANCE STANDS IS CHANGED: FROM: F07603-98-R6001 TO: F07603-98-Q0020 a. Please reference all future documents to F07603-98-Q0020 as the revised solicitation number. 3. The revised closing date for this Request for Quote is changed: From: 28 OCT 97, 4:00 P.M. (EST) TO: 4 November 1997, 4:00 P.M. (EST) (0297)

Loren Data Corp. http://www.ld.com (SYN# 0032 19971029\J-0002.SOL)


J - Maintenance, Repair and Rebuilding of Equipment Index Page