COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 30,1997 PSA#1962US Army ARDEC, AMSTA-AR-PC, Picatinny Arsenal, New Jersey 07806-5000 A -- MATERIAL CHANGE PROGRAM FOR M762/M767 ELECTRONIC TIME ARTILLERY
FUZE SOL DAAE30-98-R-0506 DUE 111297 POC John M. Eilenberger,
Contracting Officer (973) 724-5522 WEB: US ARMY TACOM-ARDEC Procurement
Network, http://procnet.pica.army.mil/procacts.htm. E-MAIL: Dorothy K.
Simpson, dsimpson@pica.army.mil. The U.S. Army TACOM-ARDEC is seeking
interested parties for a proposed contractual effort to conduct a
Material Change Program (MCP) for the M762/M767 Electronic Time
Artillery Fuze. The M762/M767 is the U.S. Army's primary time fuze used
with 105mm, 155mm and 8 inch artillery weapon systems. The MCP effort
consists of a 20-month Design Enhancement (DE) Phase followed by a
Production Phase. A Government furnished Technical Data Package (TDP)
will be provided for reference as a design baseline. The DE Phase shall
focus on upgrading the M762/M767 by improving producibility, enhancing
design robustness, enhancing user interface and upgrading the
technology. The following areas shall specifically be addressed:
qualify a quartz crystal that can undergo solder reflow; improve
producibility of S&A assembly; improve encapsulation method; improve
battery connection; improve ESD shield design; improve shield cap
producibility; upgrade/combine CMOS and Linear integrated circuit
chips; implement use of M100 Electric Detonator; improve producibility
of electro-explosive components; design a more rough handling
resistant Ogive & enhance point detonating mechanism design; assure
waterproofness; improve battery rise time; show "PD" readout in LCD;
allow increment and decrement of digits in LCD for manual setting and
add Explosives Ordnance Disposal render safe (self-neutralization)
circuitry. During the DE Phase the contractor shall provide 2,200
prototype fuzes (M762E1/M767E1) for design verification and production
prove-out testing. Upon successful completion of the DE Phase the
contractor shall also provide a Detailed Specification Package with
drawings that reflect all changes made to the baseline design. Approval
will subsequently be granted to proceed into the Production Phase in
which production of 50,000 to 100,000 of the upgraded fuze (M767A1
only) shall be required. The contractor will also be encouraged to
partner with the government via voluntary membership in a government
chaired Integrated Product Team so as to facilitate design and program
decisions. Distribution Statement D applies to the M762/M767 TDP,
i.e., distribution is authorized to the Department of Defense and DoD
contractors only. The TDP contains sensitive technology on a new weapon
system. This determination was made on 5 July 1988. Other requests for
this document will be referred to Commander, TACOM-ARDEC, ATTN:
AMSTA-AR-CCF-D, Picatinny Arsenal, NJ 07806-5000. Firms with experience
in the areas cited above should provide a summary of their firm's
capabilities within 15 days of this publication to point of contact,
Dorothy K. Simpson, ARDEC-TACOM, ATTN: AMSTA-AR-PC-E, Bldg. 10,
Picatinny Arsenal, NJ 07806-5000. Facsimile responses may be sent to
(973) 724-4662. Those who respond to this notice will not be notified
either of the receipt or the assessment of the information submitted.
Those who respond are to indicate their business size standard. This
market survey is for information planning purposes only, does not
constitute a RFP, and isnot to be construed as a commitment by the
government. See number Notes 25 and 26. (0301) Loren Data Corp. http://www.ld.com (SYN# 0003 19971030\A-0003.SOL)