COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 30,1997 PSA#1962Metcalf & Eddy International, Inc., 30 Harvard Mill Sq., Wakefield, MA
01880-5731 Y -- GAZA WASTEWATER PROJECT AND GAZA WASTEWATER TREATMENT PLANT
PROJECT, CONSTRUCTION SERVICES DUE 110797 POC Ellen Kelley, (781)
224-6258. Metcalf & Eddy International, Inc. wishes to procure the
construction services of a U.S. firm with relevant past experience and
good financial standing for the purpose of constructing the following
outlined items in connection with two projects funded by USAID in
Gaza. Contractors will be pre-qualified and a qualified contractors'
list will be established. Contractors selected as being the most
qualified will be placed on the qualified contractors' list. After
establishment of a qualified contractors' list, an RFP will be issued
to the firms on the qualified contractor's list for the joint
requirements of both projects. For the Gaza Wastewater Project, the
work contemplated will include, but will not be limited to the
following: (i) construction of new sewage pumping stations, including
the construction of all buildings, ancillary equipment and structures,
siteworks, and demolition of existing facilities; (ii) construction of
intercepting sewers; (iii) construction of two force mains, including
construction of all necessary washouts, air relief, thrust blocks and
markers; (iv) diversion of sewage flows; (v) expansion of the existing
Sheikh Radwan storm water retention reservoir; including construction
of new inlet structure, construction of access road and peripheral
landscaping; (vi) construction of storm water culverts; (vii)
construction of infiltration and storm water balancing area; (viii)
redevelopment of the existing Railroad Station site for sport and
leisure purposes; including all necessary landscaping. The Gaza
Wastewater Treatment Plant Project, will provide an increase in plant
capacity from the current capacity of 12,000 CMD to 32,000 CMD average
daily flow. The work contemplated on this project will include, but
will not be limited to the following: (i) widening an existing inlet;
(ii) construction of a new anaerobic pond; (iii) modification to the
existing aerobic pond; (iv) construction of a bio-tower feed pump
station; (v) construction of two high rate bi-towers of 26 m diameter
and 7.5 m media depth; (vi) construction of a bio-tower effluent
distribution chamber; (viii) construction of an effluent pump station;
(iv) as well as modifications to an existing facultative pond, an
existing effluent pump station, and existing reuse facilities.
Interested contractors may obtain a pre-qualification package by
sending a mailed or faxed request to: Metcalf & Eddy International,
Inc., Attn: Ellen Kelley, 30 Harvard Mill Square, Wakefield, MA 01880,
Fax No.: (781) 245-0823. TELEPHONE REQUESTS WILL NOT BE HONORED.
Please assure that your complete business address, city, state, zip
code, telephone and fax numbers are included in your request. Copies of
this solicitation are forwarded via U.S. mail. Any special mailing
requests will be at the requesters expense. Completed pre-qualification
packages are due to the above address on November 7, 1997 at 2:00 p.m.
E.S.T. All firms will be advised with four weeks after that date as to
their pre-qualification status. (0301) Loren Data Corp. http://www.ld.com (SYN# 0084 19971030\Y-0007.SOL)