COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 18,1997 PSA#1974Commanding Officer, Southern Division,Naval Facilities Engineering
Command, 2155 Eagle Drive, P. O. Box 190010, North Charleston, SC
29419-9010 Z -- INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONSTRUCTION
CONTRACTS FOR RENOVATION, ALTERATIONS, AND REPAIRS, IN THE AREA OF
RESPONSIBILITY OF SOUTHNAVFAC FIELD OFFICE NAVAL SUPPORT ACTIVITY
MEMPHIS, MILLINGTON, TN TO INCLUDE PRESIDENT'S ISLAND, NASHVILLE, TN
AND HUNTSVILLE, AL SOL N62467-98-R-0905 DUE 121997 POC Contract
Specialist: Janet Lietha, Code 0211JL. Contracting Officer: L. R. Fisk,
Code 0211. This procurement is for one solicitation resulting in the
award of three Indefinite Delivery Indefinite Quantity (IDIQ)
Construction Contracts to the responsible proposers whose proposals,
conforming to the RFP, will be most advantageous to the Government
resulting in the Best Value, Price and Technical Factors considered.
The work is for renovation, alterations, and repairs and minor
construction in the area of responsibility for NAVFACENGCOM, Southdiv
Field Office, NSA Memphis, Millington, TN, including Presidents Island,
Nashville, TN, and Huntsville, AL and other locations serviced by that
office. Projects assigned to the IDIQ contracts will use the Solution
Order Concept (SOC) approach to scope and price the work. After award
of the initial contracts, the three contractors will compete for task
orders based on either best value or low price technically acceptable
to the government. The SOC is a process consisting of on-site
walk-throughs with the IDIQ contractors and appropriate government
personnel to jointly assess and determine a statement of work ("to-do"
list), thereby developing a performance specification for the work.
The work will be routine renovation and repair of facilities including
administrative, barracks, and community support facilities with some
minor new construction incidental to the repair/alterations work.
Examples include carpeting, painting, HVAC alterations, demolition,
systems furniture, computer raised flooring, electrical interior
distribution, lighting, sales area renovations, closed circuit TV, etc.
Each contract will be for one base year with two option years. The
total 3 year estimated construction cost, including all three IDIQ
contracts is $20,000,000.00. Construction schedules will be determined
for each project at the issuance of each task order. The three Best
Value contractors will be selected for the award of either the seed
project or the award of one of the two contracts with a minimum
guarantee of $100,000.00. The first IDIQ construction contract of the
three will be awarded as a firm fixed price, for the seed project. The
initial award will be based on technical factors including
(1)Experience, (2)Past performance, (3)Technical Approach and (4) Small
Business Subcontracting Effort in descending order of importance. It
will also be based on pricing site-adapted plans and performance
specifications for three seed projects: (1)Bachelor Officer Quarters
Renovation, Building No. 599; (2)BUPERS Site Plan Implementation
Planting & Irrigation; (3)Elevator Installation in Building 455. All
three seed projects are located at the Naval Support Activity Memphis,
Millington, TN. Price and the overall technical rating are of equal
significance for the initial awards. As part of the pricing, the
Proposers will be required to participate with the government in an
on-site scope meeting for the proposed projects. The estimated
construction cost for the first seed project is between $500,000.00 and
$1,000,000.00; for the second seed project is $500,000 and $1,000,000;
and for the third seed project is $25,000 to $100,000. The work under
the first seed project includes converting 12 BOQ rooms to six flag
officer suites and renovating an additional 60 rooms. Items of work
under this seed project include demolition, asbestos abatement,
painting, finish carpentry, metal doors and frames, aluminum windows,
finish hardware, drywall, carpentry, resilient tile, painting and wall
covering, miscellaneous specialties, HVAC, plumbing, electrical, and
related incidental work. The work under the second seed project
consists of the installation of an underground sprinkler system,
planting of trees and shrubs and installation of government furnished
landscape furniture. The sprinkler system requires trenching and
connection(s) to the existing water supply. Planting will include
shrubs and trees of various species and sizes. The government landscape
furniture will include but not be limited to railings, trash cans,
bicycle stands and signage. Work under the third seed project involves
installation of a hydraulic elevator that complies with the
requirements of the Americans with Disabilities Act in Building 455, an
existing three story building of masonry and steel construction.
Example future projects expected to be accommodated under these IDIQ
construction contracts include: DFAS Building Renovations
$5,000,000-$10,000,000; Navy Exchange Renovations $1,000,000 --
$2,000,000; Child Development Center $300,000 -- $500,000; up to a
total of $10,000,000 in miscellaneous quality-of-life alterations to
various bachelor quarters. The anticipated minimum size of task orders
is $50,000 and the maximum is $5,000,000. Refer to the RFP for
detailed submittal requirements for technical & price factors. The RFP
issue date is scheduled for 19 November 1997. The pre-proposal
conference is scheduled for 02 December 1997 at Naval Support Activity
Memphis, Millington, TN. Contact Shirley Shumer at 803/820-5923 for
detailed instructions. The proposal due date is scheduled for 19
December 1997, and the targetedaward date is 15 January 1998. All three
contractors will competitively bid on subsequent task orders. These
subsequent projects will be non-complex performance oriented tasks
requiring minimal design. They will be scoped by the
Government/Contractor team and may not have traditional plans and
specifications but may include sketches, and requests for catalog cuts
or other submittals. The salient requirements of the Task Order will
be scoped by the Government/Contractor team in order to develop
mutually agreed upon Statements of Work. Award factors will vary
depending on the unique requirements of each Task Order, however
pricing will weigh at least 50%. The awarded Task Order will be
performance scoped, firm fixed price task with a specific completion
date. Should the third IDIQ contractor be unable to competitively
secure a Task Order to meet the minimum guarantee, award factors may be
modified in order to ensure each participating contractor is awarded
Task Orders meeting the minimum guarantee. All three Contractors will
be required to participate in all SOC walk-throughs and submit
proposals. Failure to participate responsibly in walk-throughs and
submit proposals on Task Orders may result in the Government not
exercising the option to extend the contract for an additional year.
Only the three selected Contractors will be permitted to propose on the
Task Orders. Proposals from other contractors will not be accepted. A
minimum of two proposals will satisfy the competitive requirements of
SOC and preclude the necessity of soliciting for a replacement
contractor if for any reason one of the contracts is terminated or one
of the proposers is justifiably not able to participate in the
process. Failure to participate responsibly in the task order process
may result in forfeiture of the minimum guarantee amount. This
Solicitation is hereby being issued on an "Unrestricted" Basis inviting
full and open competition. For RFP packages: There is a $35.00
Non-Refundable charge for each set. When requesting please reference
RFP N62467-98-R-0905 Indefinite Delivery Indefinite Quantity (IDIQ)
Construction Contract for Renovations, Alterations, and Repairs, in the
Area of Responsibility of SOUTHNAVFAC Field Office, Naval Support
Activity Memphis, Millington, TN. The Point of Contact for ordering RFP
packages is Ronnie Mitchum at 803/743-4040. To obtain the RFP Packages
you may CHARGE your request to a Corporate VISA/MASTERCARD Credit Card
or make your check payable to US Treasury and send to The Defense
Automated Printing Service, Attn: Ronnie Mitchum, P. O. Box 71359,
Charleston, SC 29415 or for Direct or Express Mail Delivery address
your request to Suite "B", 2825 Avenue "D", North Charleston, SC
29408-1802. Please indicate if you are a Prime Contractor,
Subcontractor, Supplier, ETC. Please also include (1)A Point of
Contract, (2)A Telephone Number, and (3)a Fax Number. If Problems arise
concerning your request, call Ronnie Mitchum at 803/743-4040. To obtain
a Plan Holders List fax your request to 803/743-3027. Plan Holders List
will be mailed. Plan Holders List can be obtained from the Internet at
http://206.74.23.6. For inquiries about Date of Receipt of Proposals
or Number of Amendments; contact Shirley Shumer at 803/820-5923.
Technical Inquiries prior to Request for Proposals must be submitted in
writing 15 days before Proposals Due to the address listed above, or
faxed to 803/820-5853, Attn: Janet Lietha, Code 0211JL. Estimated
duration of the first seed project is 180 calendar days; the duration
of the second seed project is 120 calendar days; and the duration of
the third seed project is 120 calendar days for completion. (0318) Loren Data Corp. http://www.ld.com (SYN# 0129 19971118\Z-0017.SOL)