Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 19,1997 PSA#1975

US Army Topographic Engineering Center, Contracts Office (CETEC-CT), 7701 Telegraph Rd, Alexandria, VA 22315-3864

A -- ADVANCE IFSAR TECHNOLOGY PROGRAM, PHASE 2 POC Laverne Bonar 703/428-6627 E-MAIL: doris.bonar@usace.army.mil, doris.bonar@usace.army.mil. 22-USA Topographic Engineering Center intends to procure on a sole source basis from ERIM international of Ann Arbor, MI, services required under the Phase 2 of the Advanced IFSAR Technology Program (AITP). Under this Phase, ERIM will perform risk analysis and determine the feasability of integrating an IFSAR sensor into a military platform for the purpose of collecting and providing high resolution, high accuracy data within the timelines identified by Army requirements. (0321)

Loren Data Corp. http://www.ld.com (SYN# 0004 19971119\A-0004.SOL)


A - Research and Development Index Page