Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 19,1997 PSA#1975

JACKSONVILLE DISTRICT OFFICE, U.S. ARMY CORPS OF ENGINEERS, P.O. BOX 4970, JACKSONVILLE, FL 32232-0019

Y -- CONTRACT NO. 2, 2B BEACH RENOURISHMENT, SURFSIDE AND SOUTH MIAMI BEACH, BEACH EROSION CONTROL AND SHORE PROTECTION, DADE COUNTY, FLORIDA SOL DACW17-98-B-0003 DUE 011398 POC Contract Specialist Deidra W. Cox (904) 232-1215 (Site Code DACW17) This project is the second contract of the second periodic nourishment for the Dade County Shore Protection Project. The areas to be nourished are located at Surfside from monuments DNR 31 to DNR 36 (approximately 590,000 cubic yards) and South Miami Beach from the north jetty at Government Cut for 1,500 feet (approximately 132,000 cubic yards). The segment at Surfside will be approximately 5,500 feet long. It will have a 250-foot berm width from the Erosion Control Line (ECL) at El. 9 MLW with a foreshore slope of 1 vertical on 20 horizontal. The South Miami Beach segment will have a 180-foot berm width at E1. 14 MLW with a foreshore slope of 1 vertical on 15 horizontal. The borrow area for this project is located offshore some 15,000 feet southeast of the South Miami Beach segment. Rocks are present in the borrow area and separation will be necessary. A rock disposal area is provided for disposing of rocks in excess of 1" diameter. The rock disposal site is located directly offshore from Miami Beach about 8,500 feet. Rocks will not be separated from the sand on the beach. This contract includes the construction of an offshore artificial reef two miles off the Haulover Beach Park shoreline. The new reef will lie between two existing reefs. The artificial reef will be constructed using 314 concrete modules and approximately 8,000 tons of limerock boulders. The concrete modules must be fabricated according to the contract drawings. In the case of the limerock boulders, these must have dimensions in any one dimension between 36" and 72". A staging area for deployment will be provided on the inlet side of Haulover Beach Park. Protection of the environment, especially the existing reef system, is of paramount importance. The Contractor's operations will have to be carried out in accordance with permit requirements. It is anticipated that this project may be constructed during the turtle nesting season and precautions will have to be taken. Magnitude of construction is between $5,000,000 to $10,000,000. Invitation DACW17-98-B-0003 will be issued on or about 26 Nov 97 and opened on or about 13 Jan 98. Cost of Plans and Specifications is $30.00. Checks should be made payable to FAO USAED Jacksonville, and sent to U.S. Army Corps of Engineers, Jacksonville, Florida. THIS IS AN UNRESTRICTED ACQUISITION NOTE: Contracting information for the Jacksonville District is now available at our web site: http://www.saj.usace.army.mil/. SIC Code 1629. (0321)

Loren Data Corp. http://www.ld.com (SYN# 0120 19971119\Y-0012.SOL)


Y - Construction of Structures and Facilities Index Page