COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 20,1997 PSA#1976United States Postal Service, Major Facilities Office, 225 North
Humphreys Blvd, Memphis, TN 38166-0300 C -- DAYTONA BEACH, FL, PROCESSING & DISTRIBUTION CENTER, DESIGN/BUILD
EXPANSION SOL 475450-98-A-0007 DUE 122397 POC Rita Williams-Humphrey,
Purchasing Specialist, FAX 901/747-7408 WEB: U. S. Postal Service,
www.usps.gov. E-MAIL: U. S. Postal Service, jraley2001@aol.com. The
project consists of furnishing manpower, materials, equipment, and
supervision necessary to performed the Design and Construction of an
expansion to the Processing and Distribution Center, 500 Bill de France
Blvd., Daytona Beach, Florida 32114-9997, in accordance with U S Postal
Service conceptual plans and specifications. A fixed price contract for
the Design/Build of the expansion of the existing Processing &
Distribution Center (General Mail Facility), of approximately 29,931
gross s.f., on existing USPS property will be awarded. The building
expansion is to be a one story (20' clear height to bottom of
structure, building height may have to be transitioned at matchpoint),
economical, typical general mail facility. Representative construction
type to be: steel framed building with face brick over concrete block
to match existing facade. Exterior wall construction and finish is to
match existing. Project is to include dock addition/renovation, CCTV
and universal wiring requirements. No fixed mechanization is included.
Scope of work includes, but is not limited to, all trades typical to
the complete construction of a project such as site work, off site
work, landscape, foundation, concrete, steel, roofing, waterproofing,
interior finishes, millwork, signage, doors & windows, storefronts,
glazing, hardware, plumbing, electrical, mechanical, as described in
the solicitation for proposals. There is some demolition work in the
area of the proposed expansion, such as concrete, asphalt and other
pavement demolition/revisions and other items, as shown on site plan.
the existing postal operations must remain in operation during
construction of this addition. See the site requirement section of the
outline specifications. Phasing and enclosure partitions is required
to maintain operations and safety of employee. Time of completion is
220 calendar days after notice to proceed, to include both design and
construction. A management plan to identify on-site staffing and key
personnel assigned to this project, with appropriate resumes and
applicable SF-254 are required with this proposal. A project schedule
is also required with this proposal. This scope of work is further
defined in the plans and specifications. Construction cost is estimated
to be between $2,900,000 to $3,200,000. Return date for the above
project is December 23, 1997. To view the site, contractors/suppliers
are invited to call Mr. Richard Kowaleski, Maintenance Operations at
904/274-3538 or Mr. Danny Meyer, Manager, Maintenance, at 904/274-3539.
A twenty-four hour notice is required to view the site. If you desire
conceptual plans and specifications for this project, please send your
request, along with your none refundable cost of $150 per set, for
Priority Mail service (2 to 3 days) or $200 ($150 plus $50 express mail
fee) for Express Mail (overnight) service made payable to: Rapid
Reproductions -- Attn.: USPS; 5300 Pleasant View Rd.; Memphis, TN
38134-6414 (FAX 901/385-2679, Telephone number 901/388-6268). To
expedite, fax a copy of your request and check before mailing. If
received before 1 p.m. CDT on weekdays, the package will be mailed that
day. Be sure to reference the subject solicitation number on your
request. Plans will also be available for your inspection at the
following locations: Daytona Beach, Florida Processing & Distribution
Center, Local Plan Rooms; F.W. Dodge, Inc. This is a negotiated
procurement; therefore, offers will not be publicly opened. cbd.doc (q
nco DaytonaBch2 (0322) Loren Data Corp. http://www.ld.com (SYN# 0017 19971120\C-0002.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|