COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 24,1997 PSA#1978USDA, FSA, KCMO, ASD; P. O. Box 419205, Kansas City, MO 64141-6205 Y -- NATIONAL INFORMATION TECHNOLOGY CENTER, SNCC EXPANSION --
CONSTRUCTION OF A NEW CONTROL CENTER AND ENTRY AREA AND DEMOLITION OF
EXISTING CONTROL CENTER SOL KCMO-01-I-98 DUE 011298 POC Contact Linda
N. Bolton, 816-823-1311, Administrative Contracting Officer or Khristy
Baughman, 816-926-6084, Contracting Officer The contractor shall
provide all management, supervision, labor, materials, supplies and
equipment and shall plan, schedule, coordinate, and assure effective
and economical completion of services as follows: 1. Construction of
new Control Center and Entry Area -- Contractor will erect walls,
install a customer service counter and construct ramped access and
entry area, approximately 1300 square feet. The contractor shall supply
and install all required windows, doors, door frames and hardware to be
installed in the new SNCC and security entrances. 2. Demolish the walls
of the existing SNCC Control Center and the existing ramped access way.
The contractor shall remove and dispose of construction/demolition
debris on a daily basis. 3. Electrical work to include the installation
and or movement of the following: (a) Install electrical circuits and
lighting, (b) Install electrical power circuits to the handicapped door
operators, (c) Install electrical power circuits to the new air
conditioning unit andits associated condensing unit, (d) Relocate two
power panels from the North wall of the existing SNCC to the North wall
of the new SNCC, (e) Move all alarm/status panels from the north wall
of the existing SNCC to the North and Northeast walls of the new SNCC,
(f) Install an intercom and doorbell between the East door of the
Service Counter Entry and the Service Center. 4. Install a four (4) ton
ceiling mounted Air Conditioning Unit in the new SNCC area. The Air
Conditioning Unit shall be DX type unit with the air handling unit
mounted in the ceiling and the compressor/condensing unit remotely
located outside the South wall of the building. 5. Construction of the
walls and demolition of the old Control Center shall be in four (4)
phases. The intent of this schedule is to maintain the maximum level of
security possible throughout the execution of the contract. Performance
time estimated at 30 days. Estimated magnitude of the work is between
$100,000 and $250,000. Issue date of the Invitation for Bid
KCMO-01-I-98 is on or about December 15, 1997. Documents will be made
available upon written request to: Mail address: U. S. Department of
Agriculture, FSA, KCMO, ASD-CAB, P. O. Box 419205, Kansas City, MO
64141-6205. Requests may also be faxed to (816)926-2835. Site visit
will be December 30, 1997, USDA, FSA, KCMO, ASD-CAB, 8930 Ward Parkway,
Room 315, Kansas City, MO 64114, at 10:00 a.m. Bids are due by 2:00
p.m. CST on January 12, 1998. Street address is U. S. Department of
Agriculture, FSA, KCMO, ASD-CAB, Room 315, 8930 Ward Parkway, Kansas
City, MO 64114. SIC 1541 (0324) Loren Data Corp. http://www.ld.com (SYN# 0093 19971124\Y-0014.SOL)