Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JANUARY 8,1998 PSA#2007

U.S. Army Corps of Engineers, 600 M.L. King, Jr. Pl., Rm 821, Louisville, KY 40202-2230

C -- IDC EARTHQUAKE EVALUATION & DYNAMIC DESIGN & ANALYSIS OF MAJOR NAVIGATION STRUCTURES & SUBSTRUCTURES SOL W22W9K73649214 DUE 020998 POC Contract Specialist, Hank Smith (502) 625-7634 TITLE: ONE INDEFINITE DELIVERY CONTRACT FOR A-E SERVICES FOR EARTHQUAKE EVALUATION AND DYNAMIC DESIGN & ANALYSIS OF MAJOR NAVIGATION STRUCTURES & SUBSTRUCTURES PRIMARILY WITHIN IL, IN, KY, MI AND OH BUT COULD BE ANYWHERE WITHIN THE LOUISVILLE DISTRICT MISSION BOUNDARIES 1. CONTRACT INFORMATION: The proposed services will be obtained by a negotiated Firm Fixed Price Contract. The maximum amount of the contract shall not exceed $500,000, and no individual delivery order shall exceed $150,000. The contract period is one year from date of award, with two option periods (each additional year with an additional ceiling amount of $500,000 respectively). Before award of this contract, the firm (if a large business concern) shall be required to present an acceptable Small Business and Small Disadvantage Business Subcontracting Plan in accordance with Public Law 95-507. To meet the current subcontracting goals, 61.2% of the total subcontracted dollars must go to small business firms, 9.1% must go to small disadvantaged business firms, and 4.5% must go to woman-owned firms. The plan is not required with this submittal. 2. PROJECT INFORMATION: Expected project activities would involve the evaluation of earthquake ground motion using deterministic and probabilistic seismic hazard analysis approaches. In addition, the evaluation of time dependent loadings and design application of dynamic loading to soil and pile founded massive concrete hydraulic structures using two dimensional and three dimensional soil pile interaction models may be required. Static and dynamic finite element analysis of soil structure interaction for structures founded on rock may also be required. 3 SELECTION CRITERIA: See Note 24 for general selection process information. The selection criteria in descending order of importance (first by major criterion and then by each sub-criterion) are listed below. Criteria a-d are primary and 3-h are secondary: a. Professional Qualifications: Qualified registered professional engineers (designers and checkers) with expertise pertaining to the above project information data. Firms must provide resumes in the SF 255 for the team designers and checkers. B. Specialized Experience: including documented experience (i.e. Engineering Awards and/or published work, etc.), and technical competence in earthquake ground motion evaluation; design and analysis of massive concrete hydraulic structures (locks, dams, approach walls, stilling basins, etc.) founded on soil and/or pile foundations and rock foundations; seismic analysis of soil-pile- structure interaction; application of programs such as SASSI, FLUSH, etc. in the design of hydraulic structures; and experience in hazard analysis for central United States seismic zones. C. Capacity to complete the work in the required time. D. Past performance on DOD and other contracts with respect to cost control, quality of work, and compliance with performance schedules. E. Geographical location and knowledge of the locality. F. Volume of DOD contract awards in thelast 12 months as described in Note 24. G. Superior performance evaluations on recently completed DOD contracts. H. Extent of participation of SB, SDB, historically black colleges and universities, and minority institutions in the proposed contract team, measured as a percentage of the estimated effort. 4. SUBMITTAL REQUIREMENTS: a. See Note 24 for general submission requirements. Firms which are interested and meet the requirements described in this announcement are invited to submit one completed SF 255 Revision 11-92), U.S. Government A/E and Related Services for Specific Projects to the office shown above. All responses on SF 255 to this announcement must be received on later than 4:30 pm Local Time on the 30th calendar day after the date of this publication to be considered for selection. The day following this CBD announcement counts as day number 1. If the 30th day falls on Saturday, Sunday or a U.S. Gov=t holiday, the deadline is the close of business on the next Gov=t business day. b) It is requested that interested firms list the fee amount and date of all DOD contracts awarded during the last 12 months to the firm and all subsidiaries in Block 9 of the SF 255. c. Responding firms must submit a current and accurate SF 254 for each proposed consultant. Additionally all responding firms which do not have a current (within 12 months) SF 254 on file with the North Pacific Division, Corps of Engineers must also furnish a completed SF 254. Any firm with an electronic mailbox responding to this solicitation should identify such address in the SF 255. Release of firm status will occur within 10 days after approval of any selection. The business size status (large, small and/or minority) should be indicated in Block 3 of SF 255. Definition: A concern is small if its annual receipts average over the past 3 fiscal years do not exceed $2.5 million. d. No other information including pamphlets or booklets is requested or required. e. No other general notification to firms under consideration for this project willbe made and no further action is required. This is not a request for proposals. TECHNICAL POC: Charles Fox, (502) 582-6909 U.S. Army Corps of Engineers, 600 Dr. Martin Luther King, Jr., Place, Room 821, Louisville, Kentucky 40201-2230. (0006)

Loren Data Corp. http://www.ld.com (SYN# 0014 19980108\C-0003.SOL)


C - Architect and Engineering Services - Construction Index Page