COMMERCE BUSINESS DAILY ISSUE OF JANUARY 23,1998 PSA#2017U.S. ARMY ENGINEER DISTRICT, MOBILE, ATTN: CESAM-EN-MN, P.O. BOX 2288,
MOBILE ALABAMA 36628-0001 OR 109 ST., JOSEPH STREET MOBILE AL 36602 C -- IDC TO PREPARE EXTERIOR UTILITY SYSTEMS STUDIES FOR MILITARY
INSTALLATIONS WITHIN MOBILE DISTRICT; RFP: DACA01-98-R-0019 SOL
AECAXX-7336-0020 POC Contact Dewayne Brackins, 334-694-3743;
Contracting Officer, Sue L. Speights (Site Code W31XNJ) CONTRACT
INFORMATION: A-E services are required for an Indefinite Delivery
Contract to prepare exterior utility studies for Military installations
within the Mobile Districts military boundaries. This announcement is
open to all businesses regardless of size. The contract will be awarded
for a one year period with options to extend the contract for two
additional periods. Work under this contract to be subject to
satisfactory negotiation of individual task orders, with the total
contract not to exceed $250,000 for each contract period. (If the
$250,000 limit for a contract period is exhausted or nearly exhausted
prior to 12 months after the start of the period, the option for the
next contract period may be exercised). If a large business is selected
for this contract, it must comply with FAR 52.219-9 regarding the
requirement for a subcontracting plan for that part of the work it
intends to subcontract. The subcontracting goals for this contract are
a minimum of 52.5% of the contractor's intended subcontract amount be
placed with small businesses (SB), as well as small disadvantaged
businesses (SDB), and women owned business, 8.8% be placed with SDB,
and 5% for women owned business. The subcontracting plan is not
required with this submittal. PROJECT INFORMATION: Work performed under
this contract will include all necessary efforts to perform exterior
utility studies and projects, not limited to the following: Work will
primarily consist of field surveys and development of exterior drawings
as required to reflect current conditions, converting paper drawings to
the latest version of AutoCad or Microstation 95 format including
background information; develop complete databases for analysis of
electrical distribution systems using DVDCAL software which is being
used by the Mobile District (copies of software to be provided by
Mobile District); Analysis software, developed databases(s), and
drawings must be linked and interfaced together under a complete
utility management system. This utility management system shall include
a viewer software to access drawing data, electronic pictures,
electronic video, spread sheets, etc. The viewer software must be a
stand-alone package that requires no other software to operate. The
viewer must be capable of both viewing and editing the databases(s).
Each study shall be provided with a minimum of one (1) year maintenance
of the analysis, utility model, and databases. SELECTION CRITERIA: See
Note 24 for general selection process. The selection criteria are
listed below in descending order of importance (first by major
criterion and then by each sub-criterion). Criteria A-D are primary.
Criteria E-G are secondary and will only be used as "tie-breakers"
among technically equal firms. A. Professional Qualifications: The
contract will require the following disciplines with registration
required for Engineering: (1) Electrical Engineer; (2) Civil Engineer.
Supervisory engineers and technicians must have a minimum of six years
experience in exterior electrical distribution and two years experience
in the computer analysis of utility systems. Resumes (Block 7 of the SF
255) must be provided for these disciplines, including consultants. Use
the nomenclature as shown in this announcement. B. Specialized
experience and technical competence: In the use of DVDCAL Software to
(1) Develop a database; (2) Analysis of utility distribution systems;
(3) Converting paper drawings of utility systems, including background
information, to AutoCad and/or Intergraph format; (4) Linking database
to Autocad and/or Intergraph drawings to intergrade them into a
complete engineering management system. Two years of previous
experience in the computer analysis of utility systems utilizing
commercially available software is required; (5) In Block 10 of the
SF255 describe the firm's quality management plan, including the team's
organization with an organizational chart, quality assurance, cost
control, and coordination of the in-house work with consultants. C.
Capacity to Accomplish the Work: Capacity to do at least three (3)
$75,000 individual task orders simultaneously. The selected firm must
have the capability to perform multiple taskings concurrently. D. Past
Performance: Past performance on contracts with respect to cost
control, quality of work, and compliance with performance schedules. E.
Geographic Location: Geographic location with respect to the region
under consideration. F. Small Business and Small Disadvantaged Business
Participation: Extent of participation of small businesses, small
disadvantaged businesses, historically black colleges and universities,
and minority institutions in the proposed contract team, measured as a
percentage of the total estimated effort; G. Equitable Distribution of
DoD contracts: Volume of DoD contract awards in the last 12 months as
described in Note 24. SUBMISSION REQUIREMENTS: See Note 24 for general
submissions requirements. Firms must submit a copy of their SF 254 and
SF 255, and a copy of each consultant's SF 254. The 11/92 edition of
the forms must be used, and maybe obtained from the Government Printing
Office. These must be received in the Mobile District Office; ATTN: Mr.
Dewayne Brackins (CESAM-EN-DW) not later than close of business on the
30th day after the date of publication of this solicitation in the
Commerce Business Daily. Along with the SF 255 and SF 254, a Summary of
Capability Worksheet, version 94.1 or higher, must be requested and
submitted with the proposal. All previous Summary of Capability
Worksheet are obsolete. A worksheet in ASCII format (must send a 3 1/2
inch unformatted floppy disk) should be requested by sending a self
addressed envelope for a hard copy or a Floppy Disk Mailer for a
digital copy to: Mobile District Corps of Engineers; ATTN: Ms. Mary
Breland; CESAM-EN-DW; P.O. Box 2288; Mobile, AL 36628-0001. If the 30th
day is a Saturday, Sunday, or Federal holiday, the deadline is the
close of business of the next business day. Include ACASS number in
Block 3b of the SF 255. Call the ACASS Center at 503-326-3459 to obtain
a number. A maximum of ten (10) projects, including the prime and
consultants, will be reviewed in Block 8. Solicitation packages are not
provided. This is not a request for proposal. As required by
acquisition regulations, interviews for the purpose of discussing
prospective contractors' qualifications for the contract will be
conducted only for those firms considered highly (0021) Loren Data Corp. http://www.ld.com (SYN# 0039 19980123\C-0008.SOL)