Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JANUARY 26,1998 PSA#2018

Department of the Army, Baltimore District, Corps of Engineer, 10 South Howard Street, Room 7000, Baltimore, MD 21201-1715

Y -- PRIMARY CARE CLINIC, FORT DETRICK, MARYLAND SOL DACA31098-B-0022 DUE 031098 POC Mrs. Susan Hanle, Contract Specialist, 410-962-3204 Construction consists of new 2,369 gross square meters. All utilities are available in the relative vicinity of the Clinic site. new water line to be connected to existing 12 inch water main, electricity to be connected to existing substation, sanitary to be connected to existing 200mm sanitary line, gas to be connected to existing 6 inch line, telephone to be connected to existing telephone duct banks, cable TV to be connected to existing cable system and storm water management to be directed to existing twin culverts and onto existing retention pond. The project includes landscaping, parking access road, sidewalks, curbs and gutters, exterior lighting. The building features a sloped standing seam metal roof with a clerestory, masonry materials (brick and cast sone) with aluminum framed glass openings. Foundation is spread footings on structural fill. The floor slab is slab on grade. Structural steel roof framing. Mechanical plants are internal to the clinic site. Space cooling (pimary) to be providedby a 15,820 Mjoule per second (75 ton) capacity air-cooled chiller located at grade outside of mechanical equipment room. Primary heating to be by two gas fired hot water boilers. Plumbing to be domestic water supply, sanitary drainage, natural gas, medical vacuum, dental air and oxygen supply systems. No special sanitary waste is required. Interior wall finishes to be acoustical, ceramic tile, drywall, & brick veneer. Floor finishes to be ceramic tile, sealed concrete, vinyl tile, carpeting and in-laid rubber entrance mats. Ceiling finishes to be drywall, suspended drywall and suspended acoustical. Cabinetry to be standard and custom. Bulletin and chalk boards, projection screen and fire protection sprinkler system and medical equipment. Est. cost of construction is between $1,000,000.00 and $5,000,000.00. Completion NLT 570 calendar days. Issuance o/a 6 February 1998. This solicitation will be issued on CD-ROM and there will be no charge for the CD. Paper copies of the solicitation will not be available. All requests for this solicitation must be in writing. Written requests may be faxed to Mrs. Hanle, 410-962-2776. All responsible sources may submit a bid which will be considered. This project is UNRESTRICTED. (0022)

Loren Data Corp. http://www.ld.com (SYN# 0147 19980126\Y-0019.SOL)


Y - Construction of Structures and Facilities Index Page