Fluor Daniel Fernald, P.O. Box 538704, Cincinnati, OH 45253-8704

Z -- DEMOLITION SOL FSC620 DUE 022698 POC Randy Ector (513)648-5170 Fluor Daniel Fernald (FDF), RFP No. FSC 620 is scheduled for release on or about March 2, 1998 for a project consisting of the construction of a water storage tank and pumping station and the decontamination and dismantlement (D&D) of the Maintenance/Tank Farm Complex at the Department of Energy's Environmental Management Project in Fernald, Hamilton County, Ohio. The scope of work shall include, but not to be limited to: furnish and erect a new domestic and fire protection water storage tank, to include a new pumping station. The D&D of the Maintenance/Tank Farm Complex scope consists of structures 12A, 12D, 19A, 19C, 19D, and 19E. FDF may exercise unilateral options to have the Contractor perform D&D of additional structures: 12B, 12C, 24B, 38A, 38B, 20H, 64, 65, Locomotive and Pipe Racks. The contractor shall provide all personnel, supervision, facilities, equipment, material, supplies and services to perform this contract. The activities for the water storage tank include, but are not limited to, the design and installation of a 400,000 gallon water storage tank and skid mounted pump station; excavation, forming and placing concrete footings for water tank and pump facilities; excavation of trench and installation of a 6" water supply line, 12" FQ1 Fire line, 6" storm sewer line and 4" drain line; installation of electrical power feed from existing utility pole to pump station; installation of a blacktop drive from parking lot to pump station, final grading, raking and seeding of the construction area. The D&D work shall include surface decontamination as needed, dismantlement, segregation, cutting, containerizing, all interior components, all Asbestos Containing Material (ACM), all non-salvageable interior equipment, all exterior equipment, and above-grade masonry concrete. Dismantlement work includes the removal of all above-grade items; i.e., buildings, utility poles, light poles, pipe racks, and fencing. Below-grade dismantlement is not included, except for removal of accessible piping contained in building trenches, pits and sumps. The D&D work shall include the safe containment of any residual process (Hold-up) material found during performance of this Work. Portions of the project will be performed in a radiological contaminated environment, appropriate precautions shall be taken to contain and prevent the spread of contamination. Fixed and loose radiological contamination is known to exist. The successful contractor will be required to comply with the terms and conditions of the FEMP Site Project Labor Agreement for Union Construction Labor Forces. To be qualified to submit a proposal and receive award for this work, a prospective offeror must: (A) provide a list of all contracts meeting Criteria 1 through 6 whether successfully performed or not. The list shall include (a) type of job (brief description of work performed), (b) location, (c) point of contact and telephone number for the project owner, (d) dollar value of work performed by the prime contractor or lower tier subcontractor, as applicable, and (e) identity of lower tier subcontracts, where applicable. CRITERIA 1 -- Successful performance (quality, technical and schedule) by the prime contractor of at least one (1) federal government contract within the last five (5) years, in which the prime contractor's contract amount was greater than $3 million and at least 30% of the work was performed directly by the prime contractor. CRITERIA 2 -- Successful performance (quality, technical and schedule) by the prime contractor of single or multiple contracts in remedial de-construction/demolition work, in the last five (5) years, on projects governed by OSHA/CERCLA or OSHA/RCRA in which the aggregate prime contractor's contract value was greater than $3 million and at least 30% of the work was performed directly by the prime contractor. CRITERIA 3 -- Successful performance (quality, technical and schedule) by the prime contractor or the named lower tier subcontractor of asbestos abatement over the past five (5) years withan aggregate value greater than $3 million. At least one (1) abatement project must have been performed in exposed height conditions greater than 30 feet. (Identify on list submitted.) This work must have been performed directly by the prime contractor or the named subcontractor. CRITERIA 4 - (0027)

Loren Data Corp. http://www.ld.com (SYN# 0136 19980129\Z-0026.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page