Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 24,1998 PSA#2038

Regional Contracting Department (Code 201), Fleet and Industrial Supply Center, Box 300, Pearl Harbor, HI 96860-5300

38 -- DUST COLLECTOR SOL N00604-98-Q-A610 DUE 022698 POC Joeanne Fletcher-Myles, (808) 474-2397, Ext. 106, Purchasing Agent, Marguerite Mattson, Contracting Officer. DUST COLLECTOR (AMENDMENT) SOL N00604-98-Q-A610 DUE 022698. Correction: This action originally publicized in the CBD dated 2/11/98 was corrected on amendment dated 2/12/98 is hereby corrected as follows: The date set for closing is hereby extended to 26 Feb 98. The following questions have been posed: 1.How are they going to pick up the collector and fan assembly? 2. Is a common base required for the collector and fan assembly? 3. Why a spark proof fan, it is on the clean side of the collector. 4. Item 6) subparagraph(a) states: be equipped with filter cartridge and element meeting the following requirements: a) certified by and independent test laboratory, to a cleaning/filtering efficieny of at least 99.999% micron particulate. What is the micron particulate size? 5. Sub-Heading: DC shall...items(14) by the term "have overall construction housing of at least 7 gage ASTM...Do you mean the filtering housing (also known as the tube sheet) only? 6. Sub-heading "DC shall...item (1) "to simplify shipment"—can the support leg structure and hoppers be supplied loose? ANSWERS ARE AS FOLLOWS: A. The dust collector and fan assembly shall be picked up by the lugs/lifting eyes that are being provided in the contract. B. a "common" base is not required for the dust collector and fan assembly. However, if the DC is provided in multiple sections, each section must have its own frame to support it off the ground along with their own lugs/lifting eyes, nameplate, weight certification, etc. C. A spark resistance fan is requested in case the filter element/housing internals fails during operation, nothing is to prevent the steel grit from hitting the fan, thereby, causing a spark. D. See 2A BELOW. E. Yes, only the filtering housing is requested to be of at least 7 gage ASTM hot rolled steel. This does not include any internal/external structural housing framework/supports. F. No. DC shall be fully assembled and tested prior to delivery to Pearl Harbor Naval Shipyard. 2. The following was Omitted when sent to the CBD. A. Add "70" after the first word "NFPA on page 2 of 6. B. Add "efficient on 0.8 "after"DC shall...6)a).. of at least 99.999%". C. add "4" after "DC shall...13)...Seismic zone". D. Change "in para 3.7" under "DC shall..16).."to read noise level specified under environmental conditions 2)" E. Change "in para 3.7" under "fan Shall..6).."to read noise level specified under environmental conditions 1)" 3. Request evaluation factors also include "evaluation of past performance. All other information publicized in the original synopsis remains unchanged. (0051)

Loren Data Corp. http://www.ld.com (SYN# 0195 19980224\38-0001.SOL)


38 - Construction, Mining, Excavating and Highway Maintenance Equip. Index Page