|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 25,1998 PSA#2039USDI, Bureau of Land Management, Oregon State Office (952), P. O. Box
2965, Portland, Oregon 97208-2965 Y -- CANAL CREEK & S.F. PACKERS GULCH BRIDGE REPLACEMENT SOL
1422H952-B98-3013 DUE 041398 POC Sherry Marshall, 503-952-6218 E-MAIL:
BLM, or952mb@or.blm.gov. Work consists of constructing two precast
prestress concrete bridges, one at South Fork Packers Gulch Creek and
one at Canal Creek. Work includes demolition and disposal of existing
damaged bridge structures; construction of concrete substructure,
superstructure, and retaining walls; drilled shafts; placing riprap;
placing asphalt deck overlays; installing guardrail; and related site
work. Project sites are located in Linn County, Salem District, Oregon.
Project range is between $500,000 and $1,000,00. Estimated start work
is May 18, 1998 and performance time is 150 calendar days. Bonds are
required -- Bid Bond: 20%; Performance Bond: 100%; and Payment Bond:
50%. All responsible sources may submit an offer which will be
considered. (0051) Loren Data Corp. http://www.ld.com (SYN# 0127 19980225\Y-0004.SOL)
Y - Construction of Structures and Facilities Index Page
|
|