|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 2,1998 PSA#2042U.S. Department of Labor, ETA, Division of Acquisition & Assistance,
200 Constitution Ave., NW, Room S-4203, Washington, DC 20210 Y -- NEW SWIMMING POOL AT THE GARY JOB CORPS CENTER IN SAN MARCOS,
TEXAS SOL IFB-98-DAA-19-JC DUE 042398 POC Mr. Dirk Anderson, Project
Manager, (512) 476-7133 or Ms. Marion B. Carter, Contract Specialist,
(202) 219-8706 WEB: IFB-98-DAA-19-JC, http://cbdnet.access.gpo.gov.
E-MAIL: IFB-98-DAA-19-JC, carterm@doleta.gov. The work involves
construction of a new eight lane swimming pool, a new pool equipment
building, and 2,000 sf bath house, housing changing rooms, toilet and
shower facilities, at the Gary Job Corps Center in San Marcos, Texas.
The construction completion date is estimated to be 203 calendar days
from the Notice to Proceed. The estimated cost range for construction
is $500,000 to $1 Million. Plans and Specifications will be available
on or about March 18, 1998, only from the Architect/Engineering Firm of
Barnes Architects, 1508 West Sixth Street, Austin, Texas 78703. Contact
Mr. Dirk Anderson, (512) 476-7133, for additional information
concerning this project. Collect calls will not be accepted. It is
emphasized that requests for Plans and Specifications should be
directed to the A/E firm listed above to ensure proper handling of
requests. Requests must be in writing. Plans and Specifications will be
made available for pick-up at the A/E's office, or may be arranged for
delivery at an additional shipping and/or handling charges must be
pre-paid, and COD requests will not be accepted. Requests will be
answered on a first-come, first-serv basis until supplies are
exhausted. After the supplies are exhausted, the Contracting Officer
may determine whether or not a fee is warranted to duplicate the
documents. The non-refundable fee shall not exceed the actual cost of
suplication of the IFB documents, plus COD charges. A Pre-Bid Walk-Thru
is scheduled for April 8, 1998, at 2:00 P.M. local time at the Gary Job
Corps Center in San Marcos, Texas. Bid Opening Date (BOD) is scheduled
for April 23, 1998, at 2:00 P.M. local time at the office of the
Architect/Engineering firm stated above. This is a 100% Small Business
Set-Aside. The SIC Code is 1799. See Numbered Note(s) 1. (0057) Loren Data Corp. http://www.ld.com (SYN# 0112 19980302\Y-0009.SOL)
Y - Construction of Structures and Facilities Index Page
|
|