FORT MCPHERSON, GA 30330-1096 Y -- INSTALL SITE AND SOUND BARRIER AT FORT MCPHERSON, GA. SOL
DAKF11-98-B-0006 DUE 032398 POC Contract Specialist CPT KELLY SHERE 404
464 4183 (Site Code DAKF11) The work consists of the contractor
furnishing all labor, material, and equipment necessary to install one
1600 ft.(approximately) site and sound barrier in strict accordance
with the specifications within the time allotted for the contractor
performance. The barrier will be located behind Staff Row on
Ft.McPherson, GA, starting from Quarters #1 and ending at the
Campbellton Road gate. Main columns shall be W8 x 10 I-beam, set plumb
and embedded in 3000 PSI concrete, the top of which shall be crowned
6" above ground level. Panels shall be Galvalume model #R, or an
approved equal, 26 gauge, 1-1/4 inch raised rib, 12 inches oc, x 10 ft.
high. The barrier shall be a minimum of 10 ft. and a maximum of 12 ft.
from the existing chain link fence. The barrier behind Building #22
parking lot, north side, shall be no more than 4 ft. The barrier line
may be angled to offset for trees. Work area shall be barricaded with
barrels and/or caution tape. The magnitude of this project is between
$100,000 and $250,000. All eligible and responsible sources may submit
an offer which will be considered. Written or faxed (404-464-4194)
requests for the solicitation will be accepted. Telephone requests will
not be honored. (0058) Loren Data Corp. http://www.ld.com (SYN# 0122 19980303\Y-0013.SOL)
Y - Construction of Structures and Facilities Index Page
|
|