COMMERCE BUSINESS DAILY ISSUE OF MARCH 16,1998 PSA#2052JACKSONVILLE DISTRICT OFFICE, U.S. ARMY CORPS OF ENGINEERS, P.O. BOX
4970, JACKSONVILLE, FL 32232-0019 Y -- CONSTRUCTION DREDGING, SAN JUAN HARBOR DEEPENING (PHASE I), SAN
JUAN, PUERTO RICO SOL DACW17-98-B-0008 DUE 060298 POC Contract
Specialist Wanda Cruz (904) 232-2083 (Site Code DACW17) This phase of
the project will reshape, deepen, and remove/replace navigation aids
for the following portions of San Juan Harbor: (1) The Graving Dock
Channel will be narrowed by 50 feet and deepened from a depth of 30
feet to a depth of 36 feet. (2) The Puerto Nuevo Channel will be
widened by 50 feet and deepened from a depth of 32 feet to a depth of
39 feet. (3) Berthing Areas "I" through "0" along Puerto Nuevo Channel
will be deepened to a depth of 40 feet. (4) The Puerto Nuevo Turning
Basin will be reconfigured and deepened from a depth of 32 feet to a
depth of 39 feet. (5) The Sabana Approach Channel will be widened by
150 feet and deepened from a depth of 30 feet to a depth of 32 feet.
The above channels will be dredged to their new project depths plus 1
additional foot of required dredging plus 2 feet of allowable overdepth
dredging. (6) The existing U.S. Coast Guard Navigation Light Nos. 3 and
5 are to be removed and replaced with new structures at the specified
locations. In addition to the BASE BID items listed above (dredging
approximately 3.5 million cubic yards), this contract will contain
three optional bid items. OPTIONAL BID ITEM A covers the dredging of
Berthing Areas "A" through "H" to a depth of 40 feet (approximately
171,000 cubic yards); OPTIONAL BID ITEM B covers the dredging of the
Bar Channel (approximately 605,000 cubic yards of material); and,
OPTIONAL BID ITEM C covers the dredging of an additional widener along
the westerly edge of the Bar Channel (approximately 217,000 cubic
yards). Optional Bid Items B and C will be reconfigured and will
consist of several cuts with stepped depths of 56, 51, and 49 feet. The
cut which has a project depth of 56 feet will not require dredging;
however, the other cuts will be dredged to their new project depths
plus 2 additional feet of required dredging plus 2 feet allowable
overdepth dredging. Excavation of rock from Optional Bid Items B and C
will require drilling and blasting. The majority of the dredged
material (approximately 3.5 million cubic yards) will be placed in the
approved offshore disposal area (ODMDS) located approximately 6 miles
from the project site. The remaining portion of the dredged
material-all material dredged from Station 39+40 to Station 86+21.95 of
the berthing areas (approximately 184,000 cubic yards)-will be placed
in a shallow mitigation disposal area located near the center of the
Harbor, and all material dredged from Optional Bid Items B and C
(approximately 822,000 cubic yards) will be placed in the Open Water
Disposal Area (OWDA) located in the Harbor. Contract Performance
Period: BASE Bid = 466 calendar days; Optional A = 25 calendar days;
Optional B = 491 calendar days; Optional C = 130 calendar days.
Magnitude of construction is more than $10,000,000. Pre-Solicitation
Notice will be issued on or about 24 Feb 98. Invitation
DACW17-98-B-0008 will be issued on or about 17 Apr 98 and opened on or
about 02 Jun 98. Cost of Plans and Specifications is $50.00. Checks
should be made payable to FAO USAED Jacksonville, and sent to U.S. Army
Corps of Engineers, Jacksonville, Florida. THIS IS AN UNRESTRICTED
ACQUISITION. NOTE: Contracting information for the Jacksonville
District is now available at our web site:
http://www.saj.usace.army.mil/. (0071) Loren Data Corp. http://www.ld.com (SYN# 0140 19980316\Y-0013.SOL)