|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 20,1998 PSA#2056US ARMY ENGINEER DISTR, ALBUQ, CORPS OF ENGINEERS, 4101 JEFFERSON PLAZA
NE, ALBUQUERQUE, NM 87109-3435 Y -- GAF PHASE II, WING HEADQUARTERS, HOLLOMAN AFB, NM SOL
DACA47-98-B-0009 DUE 050798 POC Contract Specialist Arabella Candelaria
(505) 342-3452 (Site Code DACA47) Description of work: The project
consists of a new two story headquarters facility with administrative
offices and supporting areas. the facility is structural steel frame,
concrete masonry exterior veneer over metal framing stud exterior wall
system. some areas will be prepped for security systems to be added by
others. Facility includes all supporting electrical, utilities, parking
lot, sidewalks and landscaping. Facility will include spec;special
electrical requirements for 50 HS equipment. Plans will be issued on or
about 6 April 1998 with bid opening on or about 7 May 1998. A ninety
(90) day bid acceptance period will apply to this solicitation. The
construction period is 475 calendar days. The cost of plans and
specification is $200.00 per set. This charge is non-refundable. Checks
should be made payable to F&A Officer UFC, Albuquerque, and mailed to
the U.S. Army Corps of Engineers Contracting Division, 4101 Jefferson
Plaza NE, Albuquerque, NM 87109-3435. For information on ordering plans
and specifications call Zdenka Hvezda at (505) 342-3456. The magnitude
of construction is between $5 and $10 Million. Bonding will be
required for this acquisition. the SIC code is 1542. The construction
contract will be Firm Fixed Price. Questions of a technical nature
should be addressed to Connie Williams at (505) 342-3345. This
acquisition is unrestricted advertising, open to both large and small
business concerns. Bidders who submitted a check for $60.00 to cover
plans and specs on Invitation for Bid DACA47-97-B-0032 (GAF Aircraft
Parking Apron, HAFB) which was cancelled, may receive a $60.00 credit
toward the purchase of these plans and specifications if they wish.
Those not interested in this project may apply their credit to any of
the GAF projects scheduled to be issued in the very near future. Please
forward your written request to Ms. Hvezda at the address listed above.
Bidders are advised that this requirement may be delayed, cancelled or
revised at any time during the solicitation, evaluation, negotiation
and/or final award process based on decisions related to DOD/GAF
changes in force structure, disposition of the armed forces and
completion of the environmental impact statement (EIS) and Record of
Decision (ROD) for the beddown of 30 additional Tornado Aircraft. In
addition, award of this project is subject to the availability of
funds. (0077) Loren Data Corp. http://www.ld.com (SYN# 0119 19980320\Y-0006.SOL)
Y - Construction of Structures and Facilities Index Page
|
|