COMMERCE BUSINESS DAILY ISSUE OF MARCH 24,1998 PSA#2058FBOP, P. O. Box 609, Pennington Gap, Virginia 24277 Y -- SOIL AND ROCK EXCAVATION, FILL, COMPACTION AND PRELIMINARY SITE
DEVELOPMENT FOR CONTRUCTION OF A UNITED STATES PENITENTIARY NEAR
PENNINGTON GAP, VIRGINIA. SOL IFB X00-0323 DUE 050798 POC Rich
Formella, Contracting Officer (540) 546-5443. The Federal Bureau of
Prisons is soliciting bids for preliminary site development for a
United States Penitentiary, Warehouse complex, Federal Work Camp,
parking areas, and roadways to be constructed near Pennington Gap,
Virginia. This package consists of, but it is not limited to: removal
of soil; blasting & excavation of rock; crushing, placement &
compaction of rock & soil; installation of storm drainage; management
of construction operations, etc. The time for completion for all
related work is 245 calendar days after notice to proceed. The
successful bidder will be required to furnish all labor, material,
equipment, and services to complete this project on time. The estimated
price range of this work is greater than $10,000,000.00. Bid packages
will be available on or about 4/7/98. Copies may only be obtained by
writing the architectural firm of Hayes, Seay, Mattern & Mattern, Inc.,
Attn: Mr. Steve Trompeter, P.O. Box 13446, Roanoke, VA 24034. Telephone
requests will not be accepted. No collect calls will be accepted. A
non-refundable bid document fee of $205.00 is required for each set of
documents desired. Checks should be made payable to: Hayes, Seay,
Mattern & Mattern, Inc. Plan rooms in Roanoke and Richmond, VA;
Charleston, WV; as well as Blountville and Knoxville, TN will receive
copies of the bid documents. The site is unoccupied and can be
available for inspection by calling Mr. Joe Deardorff, Project
Represntative, at (540) 546-5443. A Pre-bid conference and site visit
is currently scheduled for 10:00 a.m. E.S.T. on 4/21/98, at the Ramada
Inn, U.S. Hwy 23 & 58, in Duffield, VA. Bid opening is currently
scheduled for 11:00 a.m. E.S.T. on 5/7/98 at the Federal Bureau of
Prisons Construction Office in Pennington Gap, VA. This procurement is
not a small business set-aside. A subcontracting plan is required.
(0079) Loren Data Corp. http://www.ld.com (SYN# 0095 19980324\Y-0005.SOL)
Y - Construction of Structures and Facilities Index Page
|
|