Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MARCH 25,1998 PSA#2059

Directorate Of Contracting/Bldg 1233, Oo-Alc/ 6072 Fir Avenue, Hill Air Force Base, UT 84056-5820

61 -- POWER SUPPLY SOL F42620-98-R-63256 02 POC For copy, PKX-2/Pamala Chaffee/(FAX)801-777-7522, For additional information contact Mary Lynne Adams/Lfke/[801]777-6268 Amended, Sources must be qualified prior to being considered for award. At this time there are no known sources for this requirement. Copies of the qualification package may be obtained by submitting a written or faxed request to: OO-ALC/LFKE//Bldg 1233, Attn: Mary Lynne Adams 6072 FIR AVENUE, HILL AFB, UT 84056-5820, FAX (801) 777-0389 No telephone requests will be accepted. Award will be made only if the offeror, meets qualification requirements at the time of award in accordance with FAR clause 52.209.1. Interested contractors are to submit a qualification package that is sufficient in detail and scope to provide the evaluator with a clear understanding of the offeror's approach. The qualification package shall not be priced, or include any pricing information. Use of classified information in the qualification package is prohibited. The Government will review the qualification packages and determine qualification based on the following criteria: 1. Design capability: Contractor's proposal must provide enough information to determine that the offeror has the capability to adequately develop the power supply addressing the following areas of technical expertise: a. Functional: Design of high current (greater than 400 amps) regulated, clean signal power supplies. b. Application: Design for military, high vibration/shock, rough handling, electromagnetic interference environments. c. Reliability and Maintainability: 10,000 hours meantime between failures is required. d. Manufacturing Interface: Design suitable for transition to manufacturing phase. e. Additional: Understanding of power supply requirements, i.e. startup sequence, operation, safety shutdown, interaction requirements with the next higher assembly (radar computer) and the overall system (X band Doppler radar). 2. Manufacturing capability: Contractor's proposal must provide enough information to determine the offeror's adequacy to manufacture the power supply addressing the following completely: a. Standards: Processes, etc., to ensure quality and to ensure a rugged, military-suitable product. b. Testing: Processes/procedures to develop, maintain and operate product testing program. c. Quantities: Capacity to produce quantities required. 3. Experience: Contractor's proposal must provide enough information to address previous experience in building military products similar to this requirement addressing the following completely: a. Type of product: Actual degree of similarity. b. Type of design: Actual amount of original design involved. c. Quality of and suitability of example similar products. Note: If your company has not had any previous experience in building military products similar to this requirement, please indicate so in your qualification package. The amount of time required for technical review of the qualification package is 60 days. If the qualification package is received by 1 May 1998 we can guarantee that we will have enough time to evaluate the package prior to award. If a qualification package is received after this date we can not guarantee that there will be enough time for evaluation before award of this requirement. The solicitation will be issued approximately 15 April 1998. (0080)

Loren Data Corp. http://www.ld.com (SYN# 0286 19980325\61-0002.SOL)


61 - Electric Wire and Power and Distribution Equipment Index Page