COMMERCE BUSINESS DAILY ISSUE OF MARCH 25,1998 PSA#2059U. S. ARMY ENGINEER DISTRICT, MOBILE, ATTN: CESAM-CT (PLANS ROOM NO.
1000A), P. O. BOX 2288 MOBILE ALABAMA 36628-0001, OR 109 ST. JOSEPH
STREET MOBILE, AL 36602 Y -- TWO-PHASE DSGN & CNSTR OF AN ATMOSPHERIC AIR DRYER FAC ARNOLD
AFB, TN (COFFEE COUNTY, TN) SOL DACA01-98-R-0046 DUE 051298 POC Contact
Karen Johnson, (334) 690-2535, Contracting Officer, Edward M. Slana
(Site Code W31XNJ) This project is a two-phase design/construction
project for the purpose of designing and constructing a new Atmospheric
Air Dryer Facility (AADF) to provide an additional independent source
of dry air within the Propulsion Wind Tunnels (PWT) at Arnold AFB, TN.
The new facility must be integrated with the operation of the existing
dryer to meet all PWT test requirements in tunnels 16T, 16S, and 4T.
The new dryer must be capable of a maximum air flow rate of 450 lbs/sec
with an outlet specific humidity of 1.9 grains/lb. The combined
capacity of the existing PWT Dryer and the new AADF will provide 7
days/week, 24 hours/day of continuous 200 lbs/sec dry- air support at
an inlet air specific humidity of 125 grains/lb and an outlet air
specific humidity of 1.9 grains/lb. The new dryer facility will include
the following major equipment: inlet air filters, pre-cooler system,
two parallel desiccant beds, exit air filters, a reactivation system,
a pressurization system, automatic control system, and instrumentation
system. The new dryer will also be capable of supplying 450 lbs/sec
dry-air to the tunnels through the existing PWT ducting system.
Prospective bidders and Plans/Dodge Rooms interested in receiving one
free paper copy of this solicitation must fax a request to
334-694-4343, Attn: Plans Room, CESAM, or mail the request to Corps of
Engineers, P O Box 2288, Rm 1000A, Mobile, AL 36628. Bidders must
provide complete physical mailing address for overnight delivery,
telephone and fax numbers and point of contact. Telephonic requests
will not be accepted. A limited number of plans and specifications will
be available on a first come-first serve basis, until supplies are
exhausted. Reprints will not be made. Specifications and drawings will
not be available after the bid opening date. All bid forms, bid bonds,
and other normal documents required for the bid submittal, including
amendments to the bid submittal, shall be in paper medium. Electronic
medium for the bid submittal documents will not be allowed. Critical
Path Method (Network Analysis System) is required. For this job, a
small business is defined as having average annual receipts of less
than $17,000,000 for the past three years. This solicitation includes
bid options which may not be awarded. This is a "Best Value", two phase
solicitation for the Design and Construction of Atmospheric Air Dryer
Facility at Arnold Air Force Base, Tennessee. A detailed project
description and overall project performance requirements for this
project will be included in the Request For Proposals (RFP) package.
The solicitation criteria relies upon industry standards, where
allowable, to afford the offeror a degree of design flexibility while
meeting certain specific project requirements. The successful
Contractor must design and construct complete and usable facilities, as
described in the RAP documents. One solicitation will be issued
covering both phases. Proposals will be evaluated in Phase One to
determine which offerors will submit proposals for Phase Two, and an
amendment will be issued to those selected offerors. Selection of
offerors for involvement in Phase Two will be based on technical
approach and performance capability. Detailed project design
requirements will then be added by amendment to the solicitation at the
start of the Phase Two stage of the Request for Proposals. A limited
number of firms will be invited to participate in the second phase.
Phase One proposals will be evaluated on the areas of (1) Technical
Approach, (2) Organization, (3) Specialized Experience on Similar Type
Work, and (4) Past Performance on Utilization of Small, Small
Disadvantaged and Women-Owned Small Businesses. Phase Two proposals
shall include a Partial Design Submission, Pro Forma Requirements, and
Financial Statement. Phase Two proposals will be evaluated on the
areas of (1) Design Presentation, (2) Air Dryer Design Process, (3)
Specific Personnel, (4) Preliminary Quality Control Plans, and (5)
Preliminary Project Schedules. Specific questions related to this
project may be answered by Mr. Allen Harrison at ph: 334-694-3624, fax:
334-690-2902. Refer questions on distribution of Plans/Specifications
to Ms. Karen Johnson, ph: (334) 690-2536, fax: (334) 694-4343. Bid
documents are available on or about 10 April 1998. Estimated cost of
work is between $5,000,000 and $10,000,000. Requests for plans and
specifications shall indicate in writing whether firm will bid as a
prime contractor or a subcontractor. All responsible sources may submit
an offer which shall be considered. (0082) Loren Data Corp. http://www.ld.com (SYN# 0130 19980325\Y-0010.SOL)