COMMERCE BUSINESS DAILY ISSUE OF APRIL 1,1998 PSA#2064General Services Administration, Technical Support Branch East, 1500 E.
Bannister Road, Kansas City, MO 64131-3088 Z -- MULTIPLE-AWARD CONSTRUCTION MANAGER (CM) INDEFINITE DELIVERY/
INDEFINITE QUANTITY (IDIQ) CONTRACT WITHIN IOWA, KANSAS, MISSOURI AND
NEBRASKA SOL GS06P98GYD0019 DUE 050598 POC Contract Specialist, Lisa
Hancock, (816) 823-2238, Contracting Officer, Susan Johnson, (816)
823-2281 Solicitation GS06P98GYD0019 for Multiple-Award Construction
Manager (CM) Indefinite Delivery Indefinite Quantity (IDIQ) Contract,
General Services Administration, 1500 E. Bannister Road, Room 2101,
Kansas City, Missouri 64131-3088. Project Control Number RMO98540.
Point-of-Contacts, Cy Houston, 816-823-2252, or William F. Greene, III,
816-823-2260. The Contracting Officer is Susan Johnson at 816-823-2281.
Request for Proposals (RFP) due on or about May 12, 1998. Time for
completion: 365 calendar days after receipt of notice to proceed. No
document charge or deposit is required. Request list of those who
received RFP no later than ten days before submittals are due. The
Government intends to award two (2) CM contracts from this
solicitation. Each contract will cover the States of Missouri, Kansas,
Iowa, and Nebraska, but will have a primary geographical area. Firms
will generally receive work within their primary area, but may receive
work in other parts of the four state region. The primary geographical
areas are as follows: 1) Kansas City area: includes the Kansas City
Standard Metropolitan Statistical Area (SMSA) the city of Columbia,
Missouri, and the portion of the State of Missouri west of Columbia,
the city of Newton, Iowa, and the portion of the State of Iowa west of
Newton, and the entire States of Kansas and Nebraska, 2) St. Louis
area: includes the St. Louis Standard Metropolitan Statistical Area
(SMSA), the portion of the State of Missouri east of Columbia, and the
portion of the State of Iowa east of Newton. An offeror may be
considered for both areas, provided it meets the minimum requirement in
each area, and it submits a separate package for each area. Projects
involve building construction having a cost less than $10,000,000. CM
services may include (1) Pre-Design Services (design programming,
develop management plan, schedule, budget, studies), (2) Design Phase
Services (design review, cost estimates, review schedules, cost
control), (3) Procurement Phase Service (preparation of Commerce
Business Daily (CBD) announcement, stimulate interest of construction
contractors in bidding projects), (4) Construction Phase Services
(inspection to assure contract compliance, daily logs, progress
reports, write and negotiate change proposals on behalf of the
Government), (5) Post Construction Phase Services (converting redlined
as-built drawings to CAD drawings), and (6) other related services as
required. Typical projects include initial space alterations for
tenant agencies, replacing/adding building system components
(switchgear, roofs, boilers, chillers, HVAC equipment, and low voltage
monitoring & control systems such as fire alarm), and parking lot
improvements. The majority of the projects will have estimated
construction costs in the range from $50,000 to $2,000,000. Additional
similar projects may be added to the contract if mutually acceptable
to the Government and the CM. The minimum contract amount to be awarded
in the initial contract period (1-year) will be $5,000 per firm/joint
venture and a minimum of $5,000 per firm/joint venture for each of the
exercised option periods. The maximum amount payable under each
contract shall not exceed $1,000,000 per year or any exercised option
period. The term of the contract is one year. However, at the option of
the Government and if the CM contractor's performance is satisfactory,
the contract may be extended for up to four additional one-year (1)
periods. The successful CM contractor, including its subsidiaries and
affiliates, shall not be eligible for award of a contract for A-E or
construction contract services for these projects, nor serve as a
subcontractor or consultant to any A-E or construction contractor for
these projects. This is a competitive negotiated acquisition. Because
of the critical role of the CM, the Government intends to use the
greatest value concept in selecting a CM. The greatest value concept is
a method of evaluating price and other factors specified in the
solicitation, with the goal being to select the proposal that offers
the greatest value to the Government in terms of performance and other
factors. The objective is to select the proposal that offers the most
for the money, not necessarily to select the lowest price. The RFP
contains the contract terms, scope of work and the proposal submittal
requirements. The RFP will be available about March 31, 1998.
Interested parties may fax a request for RFP to Susan Johnson at (816)
823-2273. Proposals shall be received in this office on or about May
12, 1998. Specific date and time shall be specified in the RFP. Only
one proposal may be submitted by each offeror for each area. Offerors
should submit proposals that are acceptable solely on the basis of the
initial submittal. The Government may proceed with award of the
contract without further discussion. However, the Government may
request additional information from offerors that it considers to have
a reasonable chance of being selected for contract award, and may
discuss proposals with the offerors. The Government will evaluate
allproposals. Technical factors and price will be considered. Technical
evaluation factors, in relative order of importance, are
(1)Qualifications of organization, (2) Qualifications of Proposed
Personnel, and (3) Management Plan. The price factor is not as
important as the technical evaluation factors, however, as proposals
become more equal in their technical merit, the evaluated cost or price
becomes more important. Joint venture or firm/consultant arrangement
will be considered and evaluated on a demonstrated interdependency of
the members to provide a quality service. The proposed contract is 100
percent set-aside for small business concerns. Applicable SIC Code is
8741. (0089) Loren Data Corp. http://www.ld.com (SYN# 0142 19980401\Z-0028.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|