|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 13,1998 PSA#2072Department of Veterans Affairs Medical Center, A&MMS 90C, 3200 Vine
Street, Cincinnati, OH 45220 R -- OPEN ENDED A/E SERVICES -- PRIMARILY STRUCTURAL SOL 539-23-98 DUE
052798 POC Peggy A. Doxtater, Contracting Officer, 513-475-6339;
Additional Contacts: Betty J. Dessauer, 513-475-6340; Judith L.
Blasingame, 513-475-6336 Provide professional services necessary for
the design of various in-house projects at this Medical Center which
are primarily structurall. Under this contract, the A/E may be required
to furnish structural design services for the preparation of designs,
drawings, specifications, cost estimates and miscellaneous reports,
planning and programming studies, investigations, site selection,
construction period services such as submittal review, site
inspections, and creation of final as-built drawings. Total cost of
contract, base year and all options, shall not exceed $2,000,000.
Contract period shall consist of base year with options that the
Government may exercise. Tasks will be directed by individual work
order amendments to the contract. Each work order shall not exceed
$450,000. Please be advised this is not a request for proposal as
solicitation documents are not available. Those firms who are within a
100 mile radius of Cincinnati, Ohio, are encouraged to submit Standard
Forms 254 and 255 by close of business May 27, 1998. Selection will be
based on (1) Team proposed for this project -- background of the
personnel, i.e., Project Manager, other key personnel, and
consultant(s); (2) Proposed Management Plan -- team organization, i.e.,
design phase and construction phase; (3) Previous experience of team
proposed for this project -- describe projects; (4) Location and
facilities of working office(s), i.e., Prime firm and Consultant(s);
(5) Present proposed design approach for this project, i.e., describe
proposed design philosophy, what problems do you anticipate and how do
you propose to solve them? Describe possible energy applications and
describe innovative approaches in production and design; (6) Cost
Control -- what control techniques are planned? Who will be responsible
for cost control? Review recent projects to demonstrate ability to meet
project cost target and any additional construction costs caused by
design deficiencies-not program changes; (7) Estimating Effectiveness
-- review ten most recently bid projects to demonstrate estimating
effectiveness; (8) Schedule Control -- what techniques are planned to
assure that schedule will be met? Who will be responsible to assure
that schedule will be met? Review recent projects to demonstrate
ability to meet project schedules; (9) Describe your experience and
capabilities in the following areas: Value Engineering, Life Cycle Cost
Analysis (LCCA), Critical Path Method, Fast-Track Construciton, Energy
Conservation, New Energy Resources, Environmental Assessment,
Specialized Experience, Computer Aided Design and Drafting, and other
computer applications; and Miscellaneous -- describe awards received
for design excellence, describe circumstances and outcome of any
litigation you have been involved in over the last five years, and
indicate type and amount of liability (0099) Loren Data Corp. http://www.ld.com (SYN# 0076 19980413\R-0011.SOL)
R - Professional, Administrative and Management Support Services Index Page
|
|